Construction Blogs

Khatib & Alami Achieves Time Savings of up to 40% Through a Cloud Collaboration Strategy

Khatib & Alami (K&A) is a multidisciplinary urban and regional planning, architectural and engineering consulting company operating across the Middle East, Africa, South-East Asia and Europe. With more than five decades of experience and expertise within the architecture, engineering, and construction industry, K&A have worked on some of the world’s most challenging projects.

Identifying challenges and finding solutions

As a sector that has seen its greatest evolutions in the past decade, K&A were amongst the first companies to truly adopt digital and BIM as part of its bid to be more time and cost efficient, while providing a higher standard of output for its clients. As a major multinational working on a range of multidisciplinary projects, K&A are required to collaborate with multiple different stakeholders both internally and externally. They recognised that they would need to centralise project data and create one single source of truth when it comes to project documentation to support them in managing the sheer volume and range of ongoing projects across their many different design centres. This would mean their project teams would reduce the amount of time they spent searching for, uploading, and downloading project information. They also wanted to reduce their dependency on local servers and move to a way of working that would enable them to form more collaborative partnerships with their supply chain partners.

By leveraging cloud collaboration, centralised and consolidated data for each project was open to the full range of necessary stakeholders, which in some cases went as high as 200 project team members across a number of different organisations. As a result, knowledge sharing and a comprehensive understanding of cloud collaboration and its features became more intrinsically linked to K&A’s culture. Dr. Ahmad Faeq, Senior Director for Projects Knowledge Management and Operational Excellence reflects:

“Since we started the transition to digital, we embedded technology implementation as part of our knowledge management. Based on this, we created communities of practice which became the platform to train our teams how to use cloud collaboration tools more effectively. As a result, knowledge management is now at the heart of the company, which interconnects with everything else.”

For many companies, the concept of working remotely was only implemented because of the pandemic. For K&A, however, its early-stage adoption of BIM, coupled with their multinational design centers in Cairo, Beirut, UAE and Bangalore, meant that remote working was already well underway.

“We were already using Autodesk’s Construction Cloud remotely to drive strong collaboration between our design centres, so it was a fairly smooth step when the transition to work from home became necessary,” commented Micheline Nader, Senior Project Engineer, BIM manager – road & highways.

“Before cloud collaboration tools, you were unable to work from home or remotely effectively. If we were required to do either, we were unable to access the same model, meaning any changes made would have to be saved and pasted onto the local server the following day,” recalled Yasmina Kridly, BIM Manager and Design Architect. “Since implementing Autodesk’s cloud solutions, our team can access the same model in real time, a feature that has given us a strategic advantage during the pandemic. Overall, it has enhanced our troubleshooting and submission processes by up to 90%.”

Where previous work required printed PDFs and stacks of paper stored across several locations, the integration of working in a cloud environment not only meant a faster, more centralised way to share accurate data, but an environmentally-friendly reduction in year-on-year printing from 2019 – 2020 by around 50 – 60%.

Collaboration as standard – promoting team-centric execution and culture

Thanks to K&A’s existing movement towards digital infrastructure, and spurred on by the pandemic, cloud collaboration soon played a centralised role in several projects resulting in K&A investing in more licenses and company-wide familiarisation.

“As the benefits of Autodesk Construction Cloud are significant, it is now mandated that all projects are stored on the cloud, regardless of scale or value. As one source of information, for each project, all design documents are stored in our common data environment for shared use, following ISO 19650 workflow. The client and stakeholders also have access to the project in a digital environment, which means the client can follow the work-in-progress model and provide feedback at an early stage,” commented Micheline Nader.

BIM – the foundation of technological progress

For Dr. Ahmad Faeq, the value of Autodesk’s Cloud solutions extend beyond traditional training and into a new era of ongoing development. “When we talk about BIM as the new standard, this is what I consider our first step. From here we’re able to build and develop. For example, we’re working on BIM and GIS integration to create what we call smart city management, where we link BIM with IoTs to create command centres for clients and landlords to monitor and manage their facilities during and after the construction projects. The ceiling isn’t fixed for us, so we will keep adding the technological components day after day.”

One of the challenges presented by the pandemic was the requirement to migrate project data into Autodesk’s cloud solutions for ease of development between parties, which simultaneously occurred while hiring new staff to cater for the demand. Fortunately, the data migration worked seamlessly, as did the adoption of the new staff who were able to familiarise themselves with the software and functionality.

Cited as one of the main reasons Autodesk Construction Cloud succeeded in reaching such a fast user-adoption rate is its carefully designed user interface, user experience and supplemental training provided by Autodesk. Reflecting on her earlier experiences with some predecessors of cloud solutions, Yasmina Kridly commented, “Since we started working with Revit more than a decade ago, every Autodesk product has consistently become more intuitive and mature, with a strong focus on the user experience.  This is a feature which has been carried forward into Autodesk’s Construction Cloud solutions. While many other platforms require special training or expert advice, you are quickly able to get used to Autodesk Construction Cloud, even after using it for only a few hours.”

Infrastructure-landscape-highways

Enhanced productivity through digital collaboration

From a high-level perspective, Autodesk Construction Cloud’s ability to provide a collaborative platform for teams to interact and deliver has had a unifying effect on K&A’s teamwork culture, as highlighted by Dr. Ahmad. “Autodesk Construction Cloud was one of the tools we used to fortify and strengthen the communication within the project teams. This is where the real production of our investments happened.”

This sentiment is echoed by Yasmina Kridly: “The integration of Autodesk Construction Cloud has made a huge difference. Firstly, you can access it anywhere in the world. Secondly, we save a lot of time in transferring data between design centres. Today, I’m able to review and comment on documents immediately, meaning we’re saving a significant number of working hours as a business. This was all made possible thanks to the quick responses of the Autodesk team. Whenever we had a question, there was a solution suggested by the Autodesk team. When we first started using Autodesk Construction Cloud, it didn’t have all the features it has today. Through our team making suggestions, Autodesk were very quick to implement improvements and we’ve been able to fine tune our common data environment to be perfectly suited to our exacting requirements. One of the most useful was enabling real-time cloud collaboration during the design process, a feature that saves our team between 30 – 40% in time efficiency.”

Elaborating further, Dr. Ahmad added, “For a company like K&A where time is highly valuable, the saving of 30 – 40% isn’t just a win for the projects in hand, but also for the company which can utilise its skilled teams on other projects. Certainly, Autodesk Construction Cloud, along with our digitally enabled internal environment, has been a major driver in our digital transformation, which has been great for our productivity as a business.”

“Autodesk Construction Cloud is our solution for collaboration.”

—Micheline Nader, Sr. Project Engineer, BIM manager, Khatib & Alami

Summarising her experience, Micheline Nader commented, “Utilising Autodesk Construction Cloud has significantly improved decision-making and project performance leading to reliable, clash-free, sustainable projects that benefit from low maintenance costs, risks, and higher revenue streams. It has become a lifeline for using data, consuming content and engaging in digital applications.”

The post Khatib & Alami Achieves Time Savings of up to 40% Through a Cloud Collaboration Strategy appeared first on Digital Builder.

Construction Blogs

Digital Builder Ep 23: Harnessing the Power of 3D Printing in Construction

Many industry leaders have heard of 3D printing, often in the context of concrete or small-scale homebuilding. But that’s just the tip of the iceberg. When leveraged successfully, 3D printing can play a key role in structural components (big and small), spare parts, fixtures, and even the furniture that inhabits a space. But what does it all mean to your projects?

 

Listen to the episode now

(function() { var qs, js, q, s, d = document, gi = d.getElementById, ce = d.createElement, gt = d.getElementsByTagName, id = ‘soun_der’, b = ‘https://embed.sounder.fm’; if (!gi.call(d, id)) { js = ce.call(d, ‘script’); js.id = id; js.src = b + ‘/embed.js’; q = gt.call(d, ‘script’)[0]; q.parentNode.insertBefore(js, q);}})();

You can also listen to this episode on Apple PodcastsSpotifyStitcherGoogle Podcasts, and anywhere else you get your podcasts.

 

On this podcast episode

Our guest, Stephan Mansour, is a 3D Printing & Emerging Technology Advisor at MaRiTama Ltd. Stephan is leading the international team that’s developing global 3D printing standards from the ground up, and in this episode, he takes us on a journey into the world of 3D printing in construction.

We discuss:

Common misconceptions about 3D printingHow supply chain issues have increased interest in 3D printing for constructionHow to implement 3D printing in your organizationHow upcoming standards will enable mass adoption

“Everything can be 3D-printed; it’s just a matter of how far you want to go, how scalable it is, and how much money you’re going to put in.” — Stephan Mansour

 

Podcast highlights from Episode 23

To kick things off, Stephan shared a high-level overview of 3D printing in construction. According to him, 3D printing is “laying one material over another, to build a structure that you normally have in every construction site.”

He continues, “it’s based on a 2D model or design, that is later sliced into robotic language in order to achieve the print. So the material is tailored sometimes to the printing application that is available.”

In terms of materials used, Stephan says that 3D printing can use cement, polymer plastic, synthetic materials, or different types of recycled materials.

 

Debunking the myths of 3D printing

3D printing is rapidly gaining steam in the construction industry. In fact, The 3D printing construction market is expected to hit $1.5 billion by 2024

But despite its growing popularity, there are still a number of misconceptions surrounding the technology. According to Stephan, here are some of the most common 3D printing myths. 

Myth #1: 3D printing is a new process

Some people think that 3D printing is a new thing, but nothing could be further from the truth, says Stephan. 

“The early first 3D printing machine was created in the 1930s and 1940s by a company called Urschel, based in Indiana. They actually printed several structures, and the same technology is still being used by various technology providers today,” he explains. 

“So it’s not a new technology; it started off in the 1930s and ’40s. It picked up again back in the 1990s, and since then, it’s continued to gain speed.”

Myth #2: You can print anything in 24 hours

Another misconception is about the speed with which you can print. Stephan remarks that while the actual printing time may take 24 hours, the construction period of a building can take two to three weeks. 

“Expecting to have a house available and finished in 24 hours just doesn’t work,” he adds.

Myth #3: 3D printing is cheap

There’s also the notion that 3D printing structures only cost $4,000 or $5,000. 

“I’d like to debunk that,” says Stephan, who adds that while affordable housing is possible, you can only achieve it when you’re building things at a large scale. 

“If you’re doing 100 houses, 1,000 houses—then yes, the price of technology and material will go down. But when you’re building a single house or just a handful of houses, you’re still carrying on the price of technology, material, logistics, and so on, onto those five houses.”

Myth #4: You need a large R&D department to implement 3D printing

Think 3D printing requires a ton of R&D? Think again. According to Stephan, there are numerous opportunities to get started with 3D printing without pouring a lot of money into research and development.

“There are many ways you can start getting into 3D printing. You can do it through collaboration with technology providers, pilot projects, and starting small. From there, you’ll be able to move little by little, to actually having 3D printing as part of your toolbox in the construction process.”

 

The various use cases of 3D printing 

Some construction professionals might think that 3D printing is all about concrete and building houses. However, there are many other applications for the technology. As Stephan puts it, “you could do many things with 3D printing, just like you do anything normally with conventional means of concrete, mortar, or brick.”

Intricate facades

Stephan shares that 3D printing “can play a key role in creating facades for buildings.”

This is particularly true for projects that call for intricate and unique designs. With 3D printing, the facade “doesn’t have to be square, and you don’t have to do a mold in order to achieve very artistic or inquisitive designs that you want to get into,” says Stephan.

Parts and fixtures

In addition to printing the house itself, Stephan says you can also use 3D printing for spare parts and fixtures. 

“You can 3D print everything and anything in the house, in terms of fixtures, FTS, doorknobs, lintels, door frames, doors themselves, window frames,” he shares.

Furniture

3D printing can be used to print furniture and eliminate the lead time associated with purchasing and delivering them. 

Doing so may also help you be more sustainable. “Just looking at the waste that each construction site actually produces, you can take the wood that is discarded from the formwork, turn that into dust, and print furniture,” says Stephan.

3D printing can improve efficiency in remote projects

Being able to print spare parts, furniture, and materials can also come in handy when dealing with remote projects or when you’re facing inventory shortages and supply chain issues. 

As Stephan points out, “when you talk about oil and gas and remote projects, there’s a lot of problems that happen in consortium sites. Inventory can be an issue and you may not have the right piece at the right time. When this happens, there’s usually a two- or three-week lead time.”

He continues, “3D printing can be very effective in providing that material. You can have parts available within a few hours or a day at most, as opposed to waiting three weeks. You don’t have to put the whole project on a standstill just because you’re waiting for, say, a $10 piece that is crucial in operations.”

 

How to get started with 3D printing

Implementing 3D printing isn’t just about purchasing a printer and building things from scratch. You need to consider a number of factors to ensure that your initiatives are successful. 

Stephan says, “Another misconception that we need to rebuff is that you can simply buy a 3D printer and presto—everything’s going to work. But that’s not the case. You have to think of 3D printing just like you would for any other piece of equipment in your construction site.”

Start small and address a pain point

Just like when investing in a large piece of equipment, you must determine a need for it before going out and purchasing the technology. 

As Stephan puts it, “you’re not going to buy a multimillion-dollar piece of equipment to sit on your construction site, and now scratch your head and figure out, ‘Okay, how am I going to use this?’”

Instead, you must first identify a pain point within your construction projects or operations and then figure out how a 3D printer can help you solve the issue. For instance, if you’re constantly running into delays for a particular part or fixture, you may consider investing in 3D printing so you can produce the right parts more quickly.

Determine your scope and investment

“There are many different variations, versions, and materials out there when it comes to 3D printing, so there’s no one size fits all solution,” says Stephan. 

The right setup depends on your project scope, objectives, and budget. So, make sure that these elements are ironed out at the beginning of your 3D printing journey. 

Have a clear idea of what you’d like to achieve and the investment you’re willing to make, and then let those factors inform your decisions on what materials or printers to utilize. 

Find the right partner

“Collaboration is key,” remarks Stephan. It’s essential that you find the right partners for your 3D printing projects. 

Who to partner with depends on the project as well as your capabilities. In some instances, you may need to bring in a technology partner who can help you get up and running. Maybe you need to find new vendors who can supply the materials required. 

Whatever the case, be aware of your capabilities and limitations, then use that knowledge to find the right collaborators.

The bottom line with 3D printing in construction

3D printing is gaining traction in the AEC industry, and it will continue to do so in the near future. The specific role that 3D printing will play in your organization will depend on your projects, so take the time to evaluate your pain points and objectives then find technology solutions and partners that can fill the gaps. 

 

New podcast episode every two weeks

Autodesk’s construction podcast, Digital Builder, is hosted by me, Eric Thomas. New episodes of the Digital Builder podcast go live every two weeks. 

If you’d like to take an even deeper look at 3D printing, catch the full episode of Digital Builder to learn more. 

Listen to the Digital Builder Podcast on: 

Apple PodcastsSpotifyStitcherGoogle Podcastsor wherever you listen to podcasts

The post Digital Builder Ep 23: Harnessing the Power of 3D Printing in Construction appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1419

Construction Management

Eamon Costello Future-Proofs Its 45-Year-Old Business with Autodesk Build

Eamon Costello is a construction services company based in Tralee, Ireland. For over 45 years, the family-owned business has worked across a wide range of disciplines, from healthcare and education to residential and conservation projects.

The team at Eamon Costello is focused on delivering the highest quality projects at the best value for clients. The company’s longevity is testament to the experience and commitment in the business. However, some of the company processes had become outdated – and the organisation was keen to innovate.

Overcoming inconsistency and onerous forms

Director Paul Lynch explains, “The construction industry is virtually unrecognisable from where it was even in 2000. In Ireland, we’ve seen the introduction of BCAR, and technology has progressed leaps and bounds. We had systems that were fit for purpose when they were initiated, but were laboursome and time-consuming.”

Processes at Eamon Costello were largely paper-based, with staff taking large amounts of time to compare drawings manually and fill in onerous forms. Inconsistency was a major challenge. “Younger people especially had no interest in filling out forms because they took so long, and the standard of information we were getting back could be diabolical.”

In 2019, the company leadership team had a “Eureka moment” and decided to re-evaluate the processes in place across the whole business. It was clear that a modern technology platform was needed to support data management for the long-term. Given Autodesk’s commitment to continuing product innovation, Eamon Costello chose Autodesk Build, a unified construction management software platform for connecting teams, workflows and data.

Future-proofing problematic processes

Eamon Costello introduced Autodesk Build on a pilot project, an €11 million social housing project running across multiple disciplines. “We were keen to find a good meaty project with lots of trade involvement to assess the system against,” Paul explained.

The implementation involved a reassessment of the company’s overall processes, which created some difficulties. “We hadn’t fully anticipated the number of internal challenges that would come to light during the process. It was nothing to do with the Autodesk system, but there were residual challenges that we wanted to solve.”

The pilot project was a learning experience. For example, initially the team planned to convert the existing Word and Excel forms into Smart PDFs, when actually switching straight to the Autodesk format brought more benefits. Now, Eamon Costello has a new folder structure and forms in place and is using the team’s feedback to finalise the system. “Everything will be much more streamlined for the future.”

n intuitive solution for managing information

Eamon Costello is using a wide range of functions on Autodesk Build to share information. The issues management system is already proving very beneficial. “Previously our safety audits were completely paper-based. Now, we can capture live issues on the site and assign them to specific people; that’s a huge benefit for us,” Paul explains.

The team is finding Autodesk Build very intuitive. “We’re working with many people who come from a very low base in terms of their IT capability. However, anyone who has taken the time to follow the tutorials and immerse themselves in the system is completely fine with it. It’s a real endorsement of the platform.”

Experienced members of the team are using Autodesk Build to make their working lives easier. “We have foremen who are in their mid-sixties and aren’t very high tech themselves, but are finding the platform really helpful,” Paul notes. “They can see and tag sheets at the touch of a button. Rather than being locked in an office looking at racks of drawings, they can take their phones out on-site and bring up anything they want. It’s a big achievement.”

Improving efficiency and traceability

Autodesk Build has now been rolled out across Eamon Costello, with five live projects and three more to come shortly. With around thirty users to date, Paul believes that the time-saving has been the biggest benefit so far. Sheet comparisons, for example, had been completed manually, with site managers and engineers taking what were originally hardcopy drawings and comparing them line by line.

“With Autodesk Build, you can take two versions of a drawing and see the changes that have been made instantaneously – without the risk of missing anything, like previous revisions,” Paul explains. “In fifteen minutes, I had trained our office administrator to complete sheet comparisons; it’s invaluable from a site management perspective.”

Traceability across the business has also improved. “Previously it was a huge chore for people to complete checklists and take photos back into the office. Now, documentation and quality checks can be completed digitally, providing us with information in a standardised format. It’s much easier for the team, and we’re benefitting from a higher quality of information and traceability.”

Using digital plans on-site is also beneficial for sustainability. Prior to the introduction of Autodesk Build, Eamon Costello printed 52,473 sheets and 1795m2 of plotted paper over a two-year period. Now, that printing has been completely eliminated on the projects where Autodesk Build is in place, saving paper and energy and creating more environmentally-friendly builds.

Ways of working ready for the future

Introducing Autodesk Build has already helped Eamon Costello to deal with the challenges caused by the Covid-19 pandemic, such as using the platform to host remote site meetings. Having a centralised source of information has also made the business more resilient to unexpected events, such as staff absences.

“There was one project where we lost an engineer, and the site manager was on his own for a week and a half. He said that he probably wouldn’t have coped without Autodesk, but with the platform in place he had the information he needed and could still cover the ground even in the engineer’s absence,” Paul recalls.

As well as supporting the current team, Paul believes that having modern construction software in place will help to attract younger people to the business. “We’re constantly recruiting for all kinds of roles. As soon as we tell them that we use Autodesk, you can see them getting engaged and interested.”

In the year ahead, Paul and the team will focus on making use of even more features on Autodesk Build, including progress tracking, scheduling and assets. The next stage will be to get collaborators, including designers and subcontractors, onto the platform to further improve project processes. “The Autodesk product development team has been hugely responsive to our needs. With a few minor developments, it will be a fantastic solution that will grow with us and help us to keep up with the future of the industry.”

The post Eamon Costello Future-Proofs Its 45-Year-Old Business with Autodesk Build appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1404

Construction Services

ANZ Infrastructure Industry Well-Positioned to Meet 2030 Benchmarks and Achieve Net Zero by 2050

In a first-time collaboration Autodesk (NASDAQ: ADSK), Australian Constructors AssociationConsult Australia and the Infrastructure Sustainability Council have released a joint report to support industry in accelerating a net zero future through the design and construction of the infrastructure pipeline.

The report,A net-zero future delivered through our infrastructure pipeline signals that a whole-of-business, systems-based approach across asset lifecycles is required to accelerate the journey to net zero. This includes pulling key levers such as procurement, materials, methodologies, technology and people capability.

Jon Davies, Chief Executive Officer, Australian Constructors Association said, “The record investment in infrastructure creates opportunities for the construction industry to be part of the solution to net zero.

“We all have a role to play, and it must be performed in partnership. The report sets out the options and enablers for government and industry to use in mapping the path to low-carbon, climate-resilient infrastructure,” said Mr Davies.   

Although the industry has a significant footprint it has already started to demonstrate the influence it can have on the reduction of emissions said Ainsley Simpson, CEO, Infrastructure Sustainability Council.

“The 24 As-Built Projects certified over the last four years by the Infrastructure Sustainability Rating Scheme reduced their whole of lifecyle emissions by 26.5 million tonnes of CO2e, which is equivalent to the 26 CO2e saved by the whole Australian economy in 2020,” said Ms Simpson.

There are many tools identified in the reportwhich also map key enabling levers against asset lifecycle phase, as well as a net-zero delivery model to prompt and guide decision-making – from rethinking and redefining problems and solutions through to reducing carbon intensive materials and ensuring regenerative approaches are integrated in asset design and construction.

The report also presents real-world case studies to inspire project teams to utilise, adapt, scale and accelerate further innovation.  Technology is also identified as a key enabler of decarbonisation.

Andy Cunningham, ANZ Regional Director, Autodesk, said technology supports the infrastructure industry with the tools they need to unlock insights, make better decisions, and achieve superior outcomes. 

“Software helps automate complex processes and transform data into actionable insights that empower innovators to improve the impact of everything they design, make, own, and operate. Cloud solutions and connected data environments fuel innovation—across technology, processes, supply chains, and industries. This opportunity is only accelerating,” said Mr Cunningham.

The release of the framework follows the COP26 climate talks which called for accelerated decarbonisation before 2030 to keep global temperature within 2-degree limits, and preferably to 1.5 degrees.

“Strong leadership and collaboration across the industry is going to be required to achieve accelerated net zero and keep our sector globally competitive,’’ said Nicola Grayson, CEO of Consult Australia. 

“Net zero is a shared responsibility. Through the collective members of the Australian Constructors Association, Consult Australia and the Infrastructure Sustainability Council, in collaboration with Autodesk, we are committed to working with industry and government stakeholders to drive the continuous improvement required to achieve this shared outcome. We look forward to working together to take action at scale and at pace,’’ concluded Ms Grayson.

The report is available for download here.

The post ANZ Infrastructure Industry Well-Positioned to Meet 2030 Benchmarks and Achieve Net Zero by 2050 appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1382

Construction Services

30+ Construction Industry Statistics for EMEA

Construction industry statistics and data are increasingly important as they help accelerate decision-making on and off the construction site.

Seventy-five percent of global construction industry stakeholders agree or strongly agree that the need for real-time decision-making is increasing at the project level. Data is the secret sauce to making those decisions quickly and strategically. It provides contextual information needed to move projects forward in the short term while offering a competitive advantage long-term.

And while project data is ideal for decisions in the present, relevant industry statistics can light a path in the dark for future decisions. Industry trends, both near and farsighted, are likely to impact your approach to preconstruction, technology investments, sustainability, risk analysis, workforce planning, budgeting, operational efficiency, and the list goes on. Add to that the compounding effect of the Covid-19 pandemic, which has served as both a significant challenge and powerful catalyst for growth in digital collaboration.

With these factors in mind, we’ve compiled a list of essential EMEA construction industry stats to help you better understand the landscape. These data points portray the current state of affairs while also forecasting what’s to come. We cover a several major themes, and if you’d like to dive deeper, we’ve also included to each of our sources so you can explore further.

These construction industry stats provide insight into:

The current state of the industry at the global and EMEA-specific levelsThe fastest-growing sectors and areas of demandCurrent supply chain constraints, sustainability efforts, and workforce outlooksHow a formal data strategy fits into addressing the listed challenges and opportunities

 

See statistics by topic:

General Outlook

State of the industryGrowth opportunities

Operational Challenges

Supply chainMaterial costs

Sustainability Efforts

Commitments and challengesImpact of technology on sustainability

Workforce Statistics

Labor shortages and the impact of Brexit New approaches create new jobs

Rise of Technology

The growing market for digitalisationData strategy brings a competitive edge

 

State of the industry

€11.6/£9.9* trillion estimated in global construction output by 2025. [Oxford Economics]Spending on construction accounted for 13% of the global GDP in 2020; it’s expected to reach over 13.5% in 2030. [Oxford Economics]The European Union’s (EU) total investment in construction in 2020 was €1.4 trillion or 10.7% of the EU’s GDP (€13.2 trillion). [FIEC]The European construction industry is expected to record a Compound Annual Growth Rate (CAGR) of 7.8% to reach €2.4/£2* trillion by 2024. [Cision]The United Kingdom (UK) is predicted to overtake Germany in 2023 in global output. The UK will remain the sixth-largest market after being overtaken by Indonesia in 2024.  [Oxford Economics]

 

Growth opportunities

The fastest-growing sector between 2020 and 2025 is forecasted to be infrastructure. The annual growth is expected to be 5.1% due to unprecedented levels of government stimulus driving medium-term growth. [Oxford Economics]Excess household savings (due to the pandemic) have led to an EU GDP expansion by an 8.5% annualized rate. [Oxford Economics]The demand for residential property is strong in Germany as a result of lowered mortgage interest rates due to COVID-19. As of Q2 2021, German banks have seen sales growth up to 30% compared to 2019. [ConsTrack360]The residential sector is the largest subsector driving short-term growth. It accounted for 44% of total global construction in 2020. [Oxford Economics]

 

Supply chain constraints and disruptions

Top Construction Industry Statistics for EMEA

Fifteen percent of EU contractors indicate lower production due to a lack or delayed delivery of building materials. [ING]As of 12 November 2021, the average cost of shipping a 40-ft container across major trade routes year-to-date (04/11/21) is €6,373/ £5,436* per 40-ft container. This figure is €4,108/£3504* higher than the five-year average of €2,265/£1,932* per 40-ft container. Peak costs exceeded €8,738/£7,454* per 40-ft container (as of November 2021).  [Drewry]Forty-four percent of construction companies in Germany reported problems procuring materials on time, up from less than 6% in March (as surveyed by the Ifo Institute in May). [Financial Times]Production in the German construction industry fell 4.3% in April from the previous month, despite companies in the sector reporting a record order backlog of €62 billion in March. [Financial Times]

 

Material costs

In Q1 2021, the cost of construction materials in Europe rose by the fastest rate since 2004. In July 2021, 40% of concrete, cement, and brick suppliers said they expected to raise their prices even higher. [ING]Concrete rebar (59% higher than a year ago), fabricated steel (65% higher), and imported plywood (82% higher) show the strongest price growth in September 2021 compared to 12 months prior. [BEIS via Euroconstruct]

 

Sustainability commitments and challenges

Top Construction Industry Statistics for EMEA

ESG-related capital growth in 2020 was 28%, largely due to a flow of fundraising into sustainability-related strategies. [Oxford Economics]Construction and demolition waste (CDW) produced in Europe accounts for 850 million tonnes. This is equivalent to approximately 60% of the total waste produced by Europe. [Oxford Economics]The built environment is responsible for around 40% of greenhouse gas emissions globally. [Oxford Economics]The European Commission announced in July 2021 that it will commit to a 55% reduction in greenhouse gas emissions (GHGE) from 1990 levels by 2030. [Oxford Economics]

 

Impact of technology on sustainability

European construction businesses plan to invest an average of €900,000 in the next five years to become more sustainable, with seven out of 10 investing in construction. [Autodesk]Building Information Modeling (BIM) software offers possibilities to optimize the design phase and to deliver up to 15% less CDW. [Chalmers]BIM is one of the most common tools used in sustainability initiatives (36%), enabling owners and project teams to make more data-driven decisions. [Autodesk]Fifty-three percent of construction professionals say prefabrication has the greatest potential to reduce the industry’s carbon emissions. [Autodesk]

 

Labor shortages and the impact of Brexit

Top Construction Industry Statistics for EMEA

Fourteen percent: the increase in average pay packet for UK construction workers compared to the first half of 2020. [Construction News]In 2021, 26% of EU contractors reported problems with labor shortages. [ING]Employment in the UK construction sector fell from 2.3 million in 2017 to 2.1 million at the end of 2020. This represents a 4% fall in UK-born workers and a 42% fall in EU workers. [Office for National Statistics]More than 500,000 UK-born construction workers are expected to retire in the next 10 to 15 years.  [Financial Times]Official data from the Office for National Statistics reports that UK construction vacancies hit a 20-year high in August. [Construction News]

 

New approaches create new jobs

100,000: the number of direct jobs the commercial drones market growth is projected to create in the next 20 years. [ECSO]

 

The growing market for digitalisation

Top Construction Industry Statistics for EMEA

€1 trillion: potential EU industry savings from a full-scale digitalisation in non-residential construction. [ESCO]In 2019, it was expected that the European BIM market would grow by 13% from 2016 to 2023, accounting for €2.1 billion of spend. [ESCO]

 

Data strategy brings a competitive edge

Eighty-two percent: the percentage of European construction professionals collecting more data from construction technology today than three years ago. Still, 39% say that less than half of that data is usable. [FMI + Autodesk]Only 9% of businesses always incorporate project data into their decision making while 64% do this sometimes, rarely, or never. [FMI + Autodesk]On average, bad project data results in poor decisions 41% of the time. [FMI + Autodesk]€7.1 million: the amount of waste a €1 billion contractor could avoid by making decisions using accurate data [FMI + Autodesk]*currency conversions provided by Morningstar via Google on 12 November, 2021

 

Get more insights into the industry

As these 30+ statistics have demonstrated, the industry will continue to experience big changes and developments. It’s the perfect time for construction firms to tap into that momentum and reap the benefits of taking a more strategic approach to data. To begin, benchmark your current construction process with our free assessment.

MEASURE NOW

 

 

The post 30+ Construction Industry Statistics for EMEA appeared first on Digital Builder.

Construction Services

How to Build a Business Case for a Better Data Strategy

Fewer cost overruns, fewer missed schedules, fewer safety incidents – the benefits of using quality data to inform decisions in construction projects are many.

“We are using project data to alert us to things before a problem arises,” one BIM coordinator surveyed for Autodesk Construction Cloud’s recently released global report Harnessing The Data Advantage In Construction told us.

“For example, we can track the number of encountered defects. We know once they exceed a certain number the schedule is going to be delayed. Having these insights allows us to address things when we can still do something about them.”

Our research found the construction industry is collecting more data than ever before but many are struggling to translate raw data into actionable insight.

In many cases, what is missing is the clear overarching data strategy, encompassing how data is collected, analysed and acted on.

Bad data has clear costs – our research found it caused 40% of the average construction firm’s poor decisions. Despite this, many of the more than 3,900 construction industry professionals we interviewed listed multiple roadblocks to establishing a formal data strategy.

Of those without one, the chief reasons why were:

Not knowing where to startLack of leadership and organisational supportThe cost and resources required.

So, how can the motivation and momentum needed to  better harness data be built?

Opening the black box

As useful as knowing where your destination is, it doesn’t mean anything if you don’t also know where you currently are. That’s why a good place to start is with a software audit. 

When we speak with potential clients and ask what they’re doing with their current software and why, they often don’t know. It’s a ‘black box’, they tell us. 

It’s difficult to compare what benefits a new approach would bring if it’s not clear how the current approach is functioning.

A basic software audit can give decision makers a better understanding of where they are at right now including what their systems are capable of doing, and how they’re being used. That, in itself, can be a revelation to many organisations as they start to map a smarter way forward.

Once an audit has been completed, processes can be benchmarked and compared against the concrete benefits of making a switch.

 

Engage the right stakeholders

Next, a broad and diverse group of people from within and around the organisation should be convened to help guide the process. This group should represent all stakeholders and potential data users – including major suppliers and contractors.

Their first job is to come together with decision makers to discuss how they currently make decisions and where their frustrations lie.

Where can manual, repetitive and time-consuming tasks be automated?What is it that slows decision-making down?Where are each department’s blind spots in terms of data?Where is data held and who can see it?What should be defined as ‘good’ and ‘bad’ data?In what situations are people relying on ‘experience’ and ‘know-how’ rather than accurate, real-time data to make decisions or implement changes?This can be an eye-opening process as there are always frustrations. Staff have been using technology in their private lives for long enough to know when the systems they’re using at work are inefficient.

It’s important to consider even the little things that can introduce errors. One CIO, during the research for the Harnessing The Data Advantage In Construction report, told us, “When we started to review the quality of our data, we encountered no fewer than 20 different spellings for the same supplier.” 

All of this gets in the way of developing data you can trust and base important decisions on.

At this stage, the group is in a discovery period, learning from each other the benefits to be had from a smart data strategy. 

The outcome here should be a clear understanding and prioritisation of the data categories and data capabilities that could alleviate the issues identified.

 

Imagine the future

It’s normal for a project manager to understand where a specific project is at. But it’s rare for a business executive to have the confidence to say they know for sure that a specific project is on schedule, on budget, has particular challenges that need to be solved, etc.

Executives in businesses that have smart data strategies can say this, and much more.

Data-driven systems offer such powerful insights that it can be quite a mental leap to imagine their business uses. Many organisations continue to discover new and exciting use cases for their data years after the system has been implemented.

First and foremost, it’s vital to develop buy-in. This means teams and individuals at all levels should be able to fully appreciate how a data strategy will make their jobs better, and make them better at their jobs.

“You have to take a human-centric approach,” a Senior Digital Delivery Manager told us. “You have to show them that you are reducing the amount of time wasted for them personally.

“If you are cutting down on their work by reducing time spent on administrative tasks, people are more likely to make the transformation.” 

 

Take small steps

Building a wall begins with putting a single brick in place, not placing all the bricks in a single movement. The same principle applies to instituting a successful data strategy. A successful pilot project will demonstrate the benefits better than any PowerPoint deck. 

By focusing on the project data that you know can bring the most value to the business, you will be able to demonstrate results and return on investment quickly. And good data platforms are modular and easy to integrate, meaning elements can be introduced one at a time. 

Best practice is not to change anything mid-project. Start with a new project and compare results with another project that is still using traditional methods. The more clearly you can quantify the benefits, the smoother the introduction of a full data strategy will be.

 

Ready for what comes next

It is vital for the future of many organisations that a strong business case is created. 

Up against challenges such as the labour shortage, ever more aggressive schedules, greater quality assurance expectations, more competitive bidding processes, sustainability pressures and more, the insight offered by a strong data strategy is a powerful driver of performance.

To learn more about how your competitors are making use of data, download the Autodesk/FMI Harnessing The Data Advantage In Construction report

The post How to Build a Business Case for a Better Data Strategy appeared first on Digital Builder.

Construction Blogs

Why Construction Needs an Effective Cost Management Solution 

Tired of cost overruns?

Without a connected and centralized cost management system, projects often go over budget, over schedule, and can include costly rework. That makes finding solutions that work—and work well—all that more important.

Consistently however, cost overruns have become an expected part of projects in spite of their negative impact on already-thin profit margins. So the question is: What can builders do to be confident in their cost certainty from the get go, and actually hit that target throughout a project’s lifecycle?

This is where cloud-based cost management brings everything you need together into one platform—cost control to workflows, contract management, payment applications, and change orders. All of that works seamlessly together in an easy-to-work, easy-to-learn, and easy-to-use platform.

The infographic below will help you understand common project cost issues you’ll face without a centralized cost management system.

 

 

Get cost overruns under control

If you’d like to learn how to stay on schedule and on budget, check out The Construction Cost Control Toolkit. It’s a collection of digital resources built to help your teams standardize and accelerate their cost management workflows. Everything in there is yours, completely free.

DOWNLOAD TOOLKIT

The post Why Construction Needs an Effective Cost Management Solution  appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1353

Construction Blogs

Data-Driven Insights Improving Quality With Alkondor

Based in Holland and founded in 1990, Alkondor engineers and produces façades, windows and doors, particularly for large and complex projects. The team work on a host of construction projects from residential to non-residential buildings, like hotels and cinemas, and have specialist expertise with complex architecture programmes.

 

Digitalising to reduce risk

With their own production facility in the Netherlands, 150 employees support Alkondor’s activity including Chris Schoneveld, BIM Manager and Bram Kotter, CEO. When Chris joined the team five years ago, his remit was to focus on all of Alkondor’s digital processes, including how the team can use digital solutions for better insights and modernise their ways of working.

At the time, the team used many time-consuming processes which included printing physical copies of PDF documents and delivering them between departments and to the factory manually. This meant that there was a layer of risk added to projects – working in such manual ways mean newer versions of drawings were again hand-delivered to production teams in the factory. “It was very easy for things to go wrong,” reflects Chris. “We were working in a way that was open for errors and meant there was a lot of work for everyone; we used Excel forms, handwritten notes, PDFs and spent a lot of time transferring and tracking documents.”

With all documents stored on local servers, soon the team recognised they began to have issues with different naming conventions on drawings and poor practices led to miscommunication and confusion. “It would be difficult to search between different documents,” says Chris. Alkondor decided that they needed to change the way they in which they managed their documents and knew that investment in their digital processes would help them be more efficient and collaborative when it came to working on their projects.

 

step change in ways of working

“We were already using some digital products such as Revit,” reflects Bram. “We were working with ITANNEX (Arkance systems), an Autodesk reseller, who introduced us to Autodesk Construction Cloud’s BIM 360 platform.” Alkondor began trialling BIM 360 to see how the functionality could support the team with their document management activities as well as supporting version controlling and issues management.

To start with, Alkondor undertook a pilot project with a small group who trialled using BIM 360. The pilot group tested how the team could share documents and data from Autodesk’s Revit platform straight into BIM 360, but they also tested other functionality like quality control and issues management.

After an initial trial, Alkondor decided that they wanted to roll out BIM 360 across all of the organisation and provide dedicated training to their team to ensure this investment was firmly embedded in the company’s ways of working. Bram introduced the solution during learning sessions for all employees, with Chris taking colleagues through the features and functionality. Chris also ensured he was available on site so the team using the solution were able to ask questions and troubleshoot collaboratively.

“I think the best features we have found in BIM 360 is the quality elements we can derive. We can document and freeze elements at certain points during construction,” says Chris. “This means we can complete extra quality checks which avoid extra costs that could be incurred to our products we install on site.”

The team use Ipads on construction sites and in the factory where they can access BIM 360. They use digital checklists for quality checks, and this also means they reduce the amount of paper used, ensuring Alkondor’s carbon footprint remains as low as possible.

Having digital document management practices means that all Alkondor team members can find documents quickly and easily using Autodesk Construction Cloud’s BIM 360 platform. “Being able to search and find documents easily saves a lot of time,” says Chris. “We can also see version history and there is a clear audit trail when it comes to changes.”

 

Capturing learnings for greater insights

When it comes to learnings on each project, Alkondor use BIM 360 to capture insights on the progress of their projects to provide greater certainty. Chris remarks: “We have integrated PowerBI with BIM 360 so we can visualise our data and improve outcomes. We use PowerBI and BIM 360 to provide detailed information about the project’s progress. Sometimes we adjust production and engineering processes where necessary to ensure there is no disruption to our projects.” For project managers at Alkondor, this provides them with an overview of each project helping them to make more informed decisions.

Data-Driven Insights Improving Quality With Alkondor

For Alkondor, quality is underpinned by their use of BIM 360. “All of our windows and doors are digital assets within the BIM 360 asset module,” says Bram. The team use this module to track the progress from their factory to project handover. “We add quality checks during the different stages of production and element mounting,” says Bram. “We can visualise our asset progress again using PowerBI dashboard updates with the help of Autodesk’s data connector. This updates every two hours and provides valuable information to our managers,” says Bram.

The team managers in the production area can review both data and issues using this functionality. This means that communication between the production and preparation departments are much more streamlined.

“Things are much quicker and time isn’t lost waiting on information,” – Chris Schoneveld, BIM Manager, Alkondor

“For example, colleagues in the production areas can attach issues to drawings to ensure the right materials are being ordered. This can all happen in BIM 360 with ease.”

Data-Driven Insights Improving Quality With Alkondor

This also means the teams have much more insight into what is going wrong and what can be done to change it. When it comes to Alkondor’s use of BIM 360, the company are embedding its use more and more. The team have used BIM 360 on 197 projects, documented 13810 issues and created 17500 checklists as well as 10500 assets.

 

Data, data and more data

For Alkondor, having meaningful data available to analyse is significant. Chris reflects: “We have data and dashboards to make it immediately visible. Previously, we couldn’t analyse anything, but now we can use BIM 360 to analyse everything.” When it comes to using this data, it is invaluable to be able to document and capture the quality of products at a moment in time. “In the past, we were unable to confirm with our clients that there weren’t any scratches on door panes, broken glass or concrete stripes. So if there was a defect afterwards, customers could blame us and ask to front the costs for solving it,” says Chris. Now, Alkondor has evidence of the quality of their outputs on a set date. Which is stored in BIM 360. Depending on the project, that could save somewhere between 10,000 euros to 100,000 euros.

In the future, the team is looking to add in sensor data, so that the business can offer services like predictive maintenance. As an example, they could use this functionality to identify that one door opens once a year, while another opens a thousand times a year. They could use that data to inform predictive maintenance schedules.

For Alkondor, embracing technology of the future like the use of robotics in their factories means they will enable their workforce to focus on higher value and complex work. Being able to offer data to their customers also means that they can be more transparent and provide information that will help their customer to better manage the asset in the future.

“We are committed to embracing technology today so that we can use it for the better in the future,” says Bram. “This also means we can be more flexible as a company – for example pivoting our market offering from projects to ongoing services which will provide us with more revenue streams to explore. And at the heart of all of this for Alkondor is using their data for the better.

The post Data-Driven Insights Improving Quality With Alkondor appeared first on Digital Builder.

Construction Management

How Clash Detection Evolved Into Everyone’s Tool

Teams are changing their approach to collaborative design

Over the last several years, we’ve seen a major shift in the ways project teams work together and the requirements that owners put on contractors. Design-Build project delivery, lean methodologies, and joint ventures are at an all-time high, and accelerated by digital adoption from at-home work and the Covid-19 pandemic. In fact, 58% of owners said they’ve used or plan to use design-build, moving away from traditional design-bid-build (FMI).

This could be, in large part, because design-build projects are completed 102% faster than traditional design-bid-build (DBIA). As construction teams move towards an integrated approach, organizations from Architecture-Engineering firms to contractors and trades will need to adapt their processes and adopt standard ways of working to better communicate and coordinate in dynamic environments.

 

Do the benefits of tech-driven collaboration outweigh the risks?

The fundamentals of construction haven’t changed much over time. Schedule constraints, geometry conflicts, sequencing, safety, and quality will continue to challenge project teams and require the very best from problem-solvers in every organization. Firms that react to industry changes will improve on these fundamentals—helping them to save on unnecessary costs and capture back some time back in their day. Better collaboration across the project lifecycle will pad schedule margins, focus teams on delivering up-front quality, and provide leaders with the provable success history to win the right kind of work for their firm.

As competition for new work increases and governments apply more standards to the construction industry, firms must innovate or risk losing out on the right kind of projects for their portfolio. The challenge comes with “how” firms adapt and what paths they take to improve their delivery metrics. It can’t be enough to purchase the newest technology and call it a day. The real work comes with getting buy-in from project partners and unlocking the contributions from the entire team, from architects and BIM managers to subcontractors. This is especially important in the coordination process.

 

How clash management has been done historically

Today, much of the pre-coordination meeting work rests on the shoulders of a BIM manager. Models need to be sorted, uploaded, and aggregated. Navisworks is often a tool of choice to navigate models, check for clashes, and assign issues with views. Weekly coordination meetings pull together the shared expertise of the entire project team to assess issues and work together to troubleshoot and resolve issues generated by the BIM manager.

Oftentimes, however, these meetings focus too much on low priority issues—aligning models, resolving simple clashes among teams, and making sure previous decisions were executed correctly. Slow coordination among teams compresses the overall schedule, making clash resolved models more of a luxury in some cases.

Navisworks is one of the most trusted and powerful tools for refining models. Those who know it love it. And there are no indications this level of clash granularity is ever going away. But to keep up with moving deadlines and changing design elements, project teams need to find a hybrid approach to clash management; one where engineers, architects, and trades are taking part in a simplified and continuous model coordination process while the BIM Manager uses their expertise to focus on high value issues.

 

Clash management is now for everyone, not just BIM managers

It’s not enough to throw a fresh coat of paint on the old way of managing clashes and repackage clash detection for BIM managers. A shift in mindset needs to occur that gets the whole team engaged in clash detection. Fundamentally, teams need to be collaborating throughout the week to identify, resolve, and even prevent issues from the earliest stages of a project. The value in doing so, is a better reputation for quality and timely work, less time spent on non-optimal activities, and more time spent on solving problems before they hit the field.

Clash detection must be simple enough for anyone to use it.

Clash detection then, must be simple enough for anyone to use it. It needs to automate repetitive tasks, reduce the set-up time to near zero, and work in-conjunction with the tools people use every day.

Autodesk BIM Collaborate does just that. Anyone on the project team can set up a coordination space in a common data environment, and when files are added or updated there, they are automatically clashed against the other models. Clashes are automatically grouped by object, property, system name, or type name, giving the clash novice or seasoned expert easy ways to locate types of clashes for clearing. A clash tolerance filter dynamically changes the clash list, reducing the noise and focusing individual users only on larger clashes. Clashes are arranged in a matrix so everyone is aware of the problem areas and BIM managers can focus on specific disciplines or floors.

More on the technical side, project stakeholders using third-party authoring applications for design who also want to see their files aggregated and clashed, can see their work in a multi-model context with intermediary file types like NWC or IFC. These files can be aggregated and clashed alongside RVT and DWG files.

Once a clash has been identified as an issue, it is automatically shared across the entire issue eco-system. If a design lead identifies an issue in BIM Collaborate, BIM managers in Navisworks and engineers in Revit can pick up that issue in either of those tools. The assigned issue is then tracked in each of the products, desktop or web based, throughout the system.

This allows teams to communicate about issues in the tools they use day-to-day. And with a direct link to the web from desktop applications like Revit, design teams can get a quick health check on their work in a multi-model context.

Navisworks users who need to investigate issues to determine next steps can see the highlighted clashes in context to fully understand it. If there’s any ambiguity, they can comment on an issue, which is then available in Revit, other Navisworks applications, Autodesk Docs, Autodesk Build, and Autodesk BIM Collaborate.

 

Better business for all

With this level of connectivity, multidisciplinary teams can now communicate early and often in one place, using a common data environment as a single source for project files.  Removing the barriers between teams and allowing multiple stakeholders to clear clashes improves design quality and the speed of work done in preconstruction phases. When coordination timelines compress, and they often do, it’s important to have more eyes on the constructability of a project to ensure the quality owners expect and field partners need.

Being adaptable means having the right tools for the right job. And in a world where immediate access to data is a necessary component to achieving positive project outcomes, teams need their tools to connect to a common data environment. When authoring tools, powerful clash tools, simple clash tools, and issues are all connected in one place, the difficulties of a fast-moving design-build project are no longer technological. Organizations can prove their ability to act with innovation and can build a reputation as being collaborative and predictably successful.

If you’d like to learn more about Autodesk BIM Collaborate and what it can do for your business specifically, please contact us for a demo. We’d love to show you around.

The post How Clash Detection Evolved Into Everyone’s Tool appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1329

Construction Blogs

5 Must-Hear Construction Podcast Episodes from 2021

Jobsites aren’t the only loud places in construction; the ecosystem of construction technology produces a lot of noise too. It can be difficult to cut through what’s real, what’s hype, and what can actually help you improve how your team gets their work done. That’s partly why we decided to launch Autodesk’s Digital Builder podcast and share stories from ambitious leaders from across the construction industry. 

Our podcast, we get into the corners of what works, what doesn’t, and what the future for the industry holds. To wrap up the year, I wanted to look back (in no particular order) at a few interesting episodes from 2021.

 

Episode 17: Diving Deep on Communication & Collaboration in Construction w/ Eddie & Tyler Campbell

Working across upwards of twenty companies during a project is typical in the AEC industry. Each company usually has multiple people involved as stakeholders, each with their own prescriptions and priorities. The only way for a project to run smoothly is to prioritize communication and collaboration. For the best project outcomes, everyone must be on the same page. 

Eddie Campbell, COO at ABSI (Accelerated Building Solutions, Inc.) and Tyler Campbell, Vice President, also at ABSI, are no strangers to the highs and lows of construction collaboration. The co-hosts of the Construction Brothers Podcast joined us to share best practices for increasing cooperation within projects. 

You’ll learn actionable tips for:

empowering subcontractors for better collaborationnavigating contract disputesimproving the bidding process enhancing management styles 

Listen here: Apple PodcastsSpotifyStitcherGoogle Podcasts, and anywhere else you listen.

 

Episode 20: Uncovering Actionable Insights from Construction Data with a Platform

Jim Lynch and Sid Haksar, Autodesk Construction Solutions, Digital Builder Ep. 20: Evaluating Construction Platforms and Technology

Spend any time listening to thought leaders discuss construction technology and you’ll undoubtedly hear the term “platform” come up. Understanding what to expect from a construction platform is the first step to getting the most out of the technology you use. A true platform should provide a single location for designers, engineers, and builders to harness data and tools from anywhere, at any time. 

In the twentieth episode of the Digital Builder podcast, you’ll hear from Jim Lynch, Senior Vice President & General Manager, and Sid Haksar, Head of Construction Strategy, both with Autodesk, on what defines a true platform and how to make sure you select the right one. Jim and Sid share their most tried and true tips for evaluating construction platforms and technology. 

You’ll also discover:

the top five considerations for evaluating construction platforms and technologywhat to expect from data and digitization in the future, and the importance of platforms in modern construction

Listen here:Apple PodcastsSpotifyStitcherGoogle Podcasts, and anywhere else you listen.

 

Episode 14: Demystifying Artificial Intelligence & Machine Learning in Construction: Buzzwords or Essential Tools?

ai construction

What comes to mind first when you think of Artificial Intelligence (AI) and Machine Learning (ML)? It isn’t uncommon to think of super-skilled robots and a loss of human touch in the workplace. But as you’ll discover in this episode of the Digital Builder podcast, AI and ML are key to improving the safety of jobsites, the productivity of teams, and institutional knowledge for construction firms. 

Here to demystify the realm of AI & ML in construction are Josh Kanner, Founder and CEO of Newmetrix (formerly Smartvid.io) and Pat Keaney, Director of Product Management, Intelligence at Autodesk Construction R&D. Josh and Pat break down the two innovative technologies in an accessible way while sharing real-world examples of their practice. 

You’ll walk away with a greater understanding of:

what machine learning and artificial intelligence really are how these technologies can benefit constructionwhat’s next for AI and ML in the industrythe common misconceptions about this type of technology 

Listen here:Apple PodcastsSpotifyStitcherGoogle Podcasts, and anywhere else you listen.

 

Episode 10: Global BIM Adoption: Where We’re At & Where We’re Going w/ Ariel Castillo & Steve Rollo

Digital Builder Ep 10 3 Things We Learned About The Future of BIM Adoption

The adoption of Building Information Modeling (BIM) at an international level has as many opportunities as it does challenges. Many in the industry wonder when—if ever—we’ll reach a global standard for the process. 

Ariel Castillo, Strategic Process & VDC Specialist at Miller-Davis Company, and Steve Rollo, National BIM/VDC Manager at Graham, explore these big ideas on episode 10 of the Digital Builder. As Ariel and Steve discuss the future of global BIM standardization, they’ll also share what BIM and Virtual Design & Construction (VDC) really mean. Expect to hear lots about the biggest challenges with rolling out new construction technologies as well. 

Other points of conversation include:

the state of BIM adoption and standardization in Latin America and Canadapredictions for BIM globally over the next decadeexpectations for changing terminology

Listen here:Apple PodcastsSpotifyStitcherGoogle Podcasts, and anywhere else you listen.

 

Episode 21: Data Strategy in Construction: Finding a Competitive Edge

Digital Builder Ep 21: Bringing a Construction Data Strategy to Life

Making better decisions in modern construction often comes down to having the right data. Leading firms have fine-tuned strategies for data management so they can rapidly harness insights and leverage more advanced technologies further down the line.

Jay Bowman, Managing Director of Research & Analytics at FMI, and Andy Leek, Vice President – Technology & Innovation at PARIC Corporation, break down the benefits of strong data strategies in the twenty-first episode of the Digital Builder. If you’ve always wondered how to get started on building a robust data strategy, you won’t want to miss their gems of wisdom. 

Learn from Jay and Andy about:

how to make sure you’re capturing useful datahow a baseline of data strategy leads to more advanced technologieshow to improve data literacy in constructionthe future of data in construction

Listen here:Apple PodcastsSpotifyStitcherGoogle Podcasts, and anywhere else you listen.

 

Share with your team

While we’ve highlighted five popular episodes to begin your listening journey with Autodesk’s Digital Builder podcast, feel free to binge the rest on your rides to and from work or the jobsite. Each episode is carefully curated to provide insights into the modern construction industry you just won’t find anywhere else. Don’t forget to share your favorite episodes and discuss with your team. A new episode drops every two weeks and you can subscribe on:

Apple PodcastsSpotifyStitcherGoogle Podcastsor wherever you listen to podcasts

The post 5 Must-Hear Construction Podcast Episodes from 2021 appeared first on Digital Builder.