Construction Services

50+ New Product Updates for Autodesk Construction Cloud

Discover the latest updates to Autodesk’s construction software

Our product team continues to pinpoint valuable ways to improve your favorite Autodesk products. I’m excited to share the launch of over 50 new feature releases and enhancements across Autodesk Construction Cloud products.

From creating higher quality designs to speeding up RFI workflows, the latest product updates within Autodesk Construction Cloud can be found below.

Jump to releases by product:

Autodesk Construction Cloud Unified PlatformAutodesk BuildAutodesk BIM CollaborateAutodesk TakeoffBuildingConnected>Bid Board ProBIM 360Assemble

 

 

utodesk Construction Cloud Unified Platform

* = features on both Autodesk Construction Cloud unified platform & BIM 360

Dashboards | Additional Partner Cards

Both Autodesk Construction Cloud Unified Platform and BIM 360 users now see new partner cards for Aespada, DAQS.io, Embneusys, Geometrid, Oculo, Pronovos, Safe Site Check In, Structshare, Viact.ai, and WakeCap.

Dashboards | Send Dashboard as Reports*

Both Autodesk Construction Cloud unified platform and BIM 360 users can now share data from a dashboard within Insight as a PDF report to any external team members. A great example of this is if a general contractor wanted to share a dashboard view with an owner who did not have an account. This broadens visibility into project data and allows teams to create custom dashboards and easily share relevant views. Note: PDF reports of dashboards do not include partner cards in this initial release.

Dashboards | Unified Account Level UI Enhancements

From within the Executive Overview dashboards within Insight, both Autodesk Construction Cloud unified platform and BIM 360 users now see a consistent UI to help indicate that all projects shown on this overview list are pulled from projects across both BIM 360 and ACC. This ensures that executives see a holistic view of all projects, regardless of the product used, and help improve the migration experience.

Desktop Connector | Non-Conforming File Validation*

Autodesk Construction Cloud unified platform and BIM 360 users now have the ability to select specific files, and put them through the naming validation tool to rename them in order to meet the project’s naming standard in Docs.

Desktop Connector | Right-click to Rename Files*

For any file, a user be able to right click and rename a file from Desktop Connector without needing to navigate to Docs in the web browser.

Files | Import/Export of Naming Standard*

As a project admin setting up the naming standard on a project, the admin now have the option to export a .xlsx template. They can also make adjustments to the naming standard attributes in MS Excel for ease of use and import to a single project or multiple projects.

Files | Improvements to ISE File & Folder Operations*

Autodesk Construction Cloud unified platform and BIM 360 users can now take advantage of ISO naming standards validation when moving or copying files from enforced to enforced folders​ and when making a file “current”​. Additionally, users can now have their search results be a method to organize files for selection to move or copy to an enforced folder.

Files | Open and Edit DWG with AutoCAD (web app)

From within Files, users can now right click on a .dwg file type to open the drawing within the AutoCAD web app, exposing the use of native AutoCAD tools (viewing and editing). NOTE: Once the file is clicked, a new tab is opened, exposing the AutoCAD web interface.

Library | Search & Sort

There is a new search bar as well as the option to sort within the account level library in the Autodesk Construction Cloud unified platform. This makes it easier to find library components so that teams can use consistent practices and drive standardization across all projects.

Reports | Issue Summary & Issue Detail Filter by Custom Attribute

Autodesk Construction Cloud unified platform users can now filter both the Issue Summary and Issue Detail reports by any custom attribute. This allows teams to run more specific reports that are catered to the way individual companies track issues.

Reports | Logo Management

Project Admins can now customize the logo that shows up on reports by either selecting the account logo or adding in a net new logo. This allows teams to improve the branding of their reports and provide clarity of ownership when sharing reports externally.

Reviews | Add Custom Attributes to Workflows*

The project admin can now add custom attributes to a workflow so that each review initiated has the custom attribute columns for the approve to complete as needed. Note: For BIM 360 users, only projects created after Mar 23, 2021 will have this feature.

 

 

utodesk Build

Schedule suggestion, 50+ New Product Updates for Autodesk Construction Cloud

** = features in both Autodesk Build & BIM 360

*** = features in both Autodesk Build & PlanGrid

**** = Autodesk Docs feature (available across all unified products)

***** = features in both Autodesk Build and Autodesk BIM Collaborate

Note: This list is alphabetical. Please see this blog post for Autodesk Build updates organized by workflow.

Assets | Bulk Edits on Web & Mobile

Within Autodesk Build or the PlanGrid Build mobile app, teams can now make bulk edits to a selected group of assets by simply scanning barcodes, QR codes, or NFC tags in sequence. This allows teams to better standardize information and make updates faster.

Assets | NFC Support

In addition to using barcode / QR code scanning within the Assets tool of Autodesk Build, users can now use Near Field Communication technology to pull up detailed asset information. This saves teams time since they can simply set a device within range of the asset, and all asset related information stored within the PlanGrid Build mobile app will instantly appear.

Assets | RFI References

Within the Assets tool flyout panel, teams now see an added reference option for RFI’s. This means that users can link a specific asset to an RFI, connecting information and making it more accessible throughout both the assets and RFI workflow. Note: Mobile functionality will come by the end of the month.

Assets | Schedule References

Within the Assets tool flyout panel, teams now see an added reference option for Schedule. This means that users can link a specific asset to schedule item which gives visibility into where an asset status is in relation to the broader project schedule. Having this level of visibility helps teams better plan and forecast dates. Note: Mobile functionality will come by the end of the month.

Bridge | Automatic Sheet Sharing

As a follow up to the ability to share sheets across accounts (released in July 2021), team members can now specify certain sheets that they are sharing to automatically update when a new version is published. This ensures teams, even if they are from different companies or using different accounts, are always looking at the most up to date sheet information. NOTE: We are currently working on building up the feature functionality of the Bridge tool. Please watch for more enhancements to Bridge in future releases.

Bridge | Import Functionality

Within the ‘Incoming’ tab of Bridge, Autodesk Build users see a new option to ‘Import’ and select sheets from other projects, in which they are also a member, to add to their current project. This improves cross-team and cross-project collaboration, and gives users the ability to surface relevant information to their teams. NOTE: We are currently working on building up the feature functionality of the Bridge tool. Please watch for more enhancements to Bridge in future releases.

Cost Management | Enhanced Document Review Functionality**

Autodesk Build and BIM 360 Cost Management users can open and edit Microsoft Word documents online directly from the document package section within the items details flyout panel, enhancing and accelerating the document review processes.

Cost Management | Expense Photo References

Autodesk Build Cost Management users can now add photo references (e.g., delivery tickets, receipts, etc.) to expenses, ensuring accounting has what they need to process payments.

Cost Management | Home Page**

Autodesk Build and BIM 360 Cost Management users now have access to a new Home Page within Cost Management, displaying an aggregated calendar view of important dates across the system for increased visibility.

Cost Management | Issue to Potential Change Order

Expanding on the ability to create a Potential Change Order (PCO) from an RFI or Submittal Item, Autodesk Build Cost Management users can generate a PCO directly from Issue. Continuing to help teams capture the origin of change orders.

Data Connector | Photos Data

Autodesk Build users can now extract Photos data using the Data Connector. This is especially important to teams tracking quality and safety and wanting to see details around things like how many photos have been captured.

Data Connector | Progress Tracking Data

Autodesk Build users can now extract Progress Tracking data using the Data Connector. This gives teams the ability to create custom dashboards around the use of Progress Tracking and further analyze installation progress of objects on a project using other BI tools.

Handover | Files & Issues in As Built Export

Autodesk Build users can now export Files and Issues data as a part of the As Built Export tool. This adds to the RFI, Submittals, and Sheets download that was currently available and further improves the handover process by saving time, enhancing documentation accuracy, and improving owner satisfaction. Note: Files data will not be available until the end of November.

Issues | Add reference to submittals, forms, PCOs

In addition to the existing ability to link photos, files, RFIs and assets, user can now also add a reference to submittals, forms and PCOs, directly from the issue. This way, teams ensure even more of the issue’s context gets captured.

Meetings | Upload Attachments Directly from Computer*****

Users can upload and remove attachments directly from their PC. Attachments can be added at a meeting or at an item level. This ensures up-to-date information is shared and reviewed during the meeting.

RFIs | Roles and Companies as Users

Within each RFI, all roles and companies can now be specified as a watcher or co-reviewer. This release improves ease of use when creating, editing, or assigning RFIs.

RFIs | Short RFI Creation on Mobile

Users have the option to create an RFI by simply filling out the information for three fields: RFI title, question, and photos. This feature allows users to save time on RFI creation in the field.

RFIs | Step Back From Manager to Subcontractor

This feature allows RFI managers to request additional information from subcontractors by sending the RFI back to the sub. This release helps to speed up the RFI workflow by making sure necessary changes are made in a timely manner.

Schedule | Add Cost reference

Users can reference cost items from the cost management tool to an activity in schedule.

Schedule | Enhanced iOS support

iOS users can filter schedule information by Activity codes/ Outline codes imported from the schedule authoring tools. Allowing teams to find the right information, faster.

Schedule | Suggestions [coming soon]

Users with the right permissions can now submit an update suggestion on an activity to the schedule manager, improving communication across stakeholders. The schedule managers can review, approve or reject the suggestions. The schedule manager must update the master schedule in the schedule authoring tool to ensure the latest schedule is imported into Autodesk Build.

Submittals | Import Enhancements

During the upload process, Autodesk Build users get a new processing loader which can be referred to as a progress bar. This release supports a friendlier and more transparent import process.

Submittals | Project Home Support on Mobile

Users can now view a submittals work status card on iOS & Android. This allows access to critical and actionable information faster from any device at any time.

Submittals | Report Enhancements

From the Submittal tool, users can generate both the detail and summary reports, and have the option to include specific submittal items when exporting the report. Report enhancements now also include a single item report that can be generated from the action menu. Users can also copy a public link to share the report from the panel once the report has been generated. These enhancements allow customers to have more flexibility when exporting submittal reports.

Submittals | Review & Annotate PDF Attachments

Autodesk Build users now can view and annotate submittals, such as adding an approval stamp (image stamp), text, arrow, cloud, highlighter and various shapes directly in Autodesk Build. This enables a faster and more efficient review process.

Submittals | Upload Attachments from Files or from Computer

Autodesk Build users can select up to 10 existing files from Autodesk Docs and attach it to the specific submittal item. Now, Document Management and Project Management workflows are even more connected.

Learn more about this month’s product releases specific to Autodesk Build in this blog post.

 

 

utodesk BIM Collaborate

BIM Collaborate Go Online, 50+ New Product Updates for Autodesk Construction Cloud

****** = features in both Autodesk BIM Collaborate and BIM 360

Change Analysis | Easier navigation

Design changes are now more easily managed and analyzed with a new experience that allows users to select the models they want to compare and quickly apply filters by discipline, category or modification type (shape, property, transform). Teams now have more control over the changes they decide to focus on and how those changes affect them.

Change Analysis | Review of non-consecutive designs

Previously, architects and engineers who review design changes before consuming them could only review the differences between the new design and the last design. Now, any design from the past can be reviewed alongside the latest.

Go Online | Revit Issues Add-In******

Architects, engineers, and BIM managers using Revit can immediately access issues, clash information, and models from cloud applications like Autodesk BIM Collaborate or Autodesk Docs. When an issue gets resolved in Revit, designers can use this quick link to access related files or check their work against other models using the clash matrix—making it easier to create high quality designs.

Model Coordination | Advanced grouping******

Group clash results with a greater level of granularity with advanced grouping capabilities. Now, clashes can be grouped by any property of a clashing object. Choose standard properties or custom ones to group and organize clashes for faster clearing and resolution.

Model Coordination | IFC, NWC, and VUE File Support******

With the added support of NWC and VUE files and extended support for IFC files for automatic clash detection or model aggregation, Autodesk BIM Collaborate offers greater flexibility for BIM managers, design teams, and trade partners to engage in model coordination.

 

 

utodesk Takeoff

Autodesk Takeoff Snapshots, 50+ New Product Updates for Autodesk Construction Cloud

Snapshots

Autodesk Takeoff users can preserve critical information including sheets and/or models along with associated takeoffs and inventory within a project at a given point in time. Users can access saved snapshots to view prior versions of takeoffs and inventory for a specific milestone or other key events. These stored references provide estimators confidence in their work by citing key information critical to the takeoff detail.

Flexible Output for Takeoff Types

Users can assign a code from both primary and secondary classification system to any output (primary or unlimited “additional” outputs) when creating takeoff types. The classification field is now optional, allowing estimators to create takeoffs faster when needed. The outputs not classified are automatically grouped as “unassigned” to make it easier for users to track and reassign later if needed. Each output can be assigned up to 2 classification codes—one from each classification system uploaded.

Inventory Enhancement

Users can view information from both primary and secondary classifications at the same time in the inventory panel. Multiple outputs can be seen together, grouped by takeoff type, when appropriate. A new grouping has been created in the inventory for “unassigned” outputs. Location information is also surfaced in the inventory panel.

Locations Support

Users can assign takeoffs to specific locations created in the “Project Admin” tool so quantities can be assigned accordingly. Whether you are allocating quantities by Floors, Levels, Phases or Zones, locations are a great way to organize your takeoff inventory.

 

 

BuildingConnected

Autodesk BuildingConnected

Bid Board Pro

Opportunity Rules

Users can create opportunity rules (“if/then” statements) to help organize opportunities and filter out junk invites by either applying tags or removing followers. This helps to streamline the Bid Board experience and remove unwanted invites automatically.

 

 

BIM 360

BIM360 Cost Management Home, 50+ New Product Updates for Autodesk Construction Cloud

 

****** = features in both Autodesk BIM Collaborate and BIM 360

Daily Logs | XLS Report from Field Management******

BIM 360 users can now export the activity log of any daily log. The export includes timestamp, user, activity and before after status which makes it a full audit trail useful in case any disputes arise.

Dashboards | Permission Changes******

BIM 360 users can now control permission to view certain dashboards within BIM 360. This helps drive focus for team members and eliminate unnecessary dashboard views. Additionally, it gives more control to Project or Account Admins to filter only relevant information to team members. For more information view the FAQ on our Help Site.

 

 

ssemble

Assemble special characters, 50+ New Product Updates for Autodesk Construction Cloud

Expanded Support for Special Characters

Assemble has expanded support for Unicode characters for property names and values. Assemble users can now publish model properties names and values with expanded characters from desktop tools as well as Revit models from BIM 360 and Autodesk Docs. Users are also able to sync property values with expanded characters back to Revit.

Model Publishing Improvements

Continuing to build upon the recent enhancement of publishing Revit models from BIM 360 and Autodesk Docs to Assemble without the need of the  Revit add-in, Assemble now supports importing Revit Cloud Workshare models as part of the cloud publishing workflow. By leveraging the common data environment, BIM/VDC Managers can ensure that everyone is working from the latest project documents.

 

Get the latest Autodesk Construction Cloud product updates

 

Newsletter Subscription Banner

The post 50+ New Product Updates for Autodesk Construction Cloud appeared first on Digital Builder.

Construction Management

Autodesk Build Gets 25+ Product Updates, Features, and Enhancements

See the latest updates to Autodesk Build

As Autodesk Build continues to support the successful management of projects around the world, we’ve been working behind the scenes to make it more powerful, more useful, and more valuable in its ability to connect teams to the data they need, when they need it.

In the last few months, our team has been preparing to release over 25 new updates, features, and enhancements this month—all geared towards helping you better connect your teams, data and processes. Check out the latest Autodesk Build releases below.

Jump to release details by type:

Highlighted Releases>Assets | NFC SupportCost Management | Home Page**Cost Management | Expense Photo ReferencesRFIs | Step Back from Manager to SubSchedule | Suggestions [coming soon]Submittals | Review and Annotate AttachmentsDocument Management Releases>Desktop Connector>Right Click to Rename FilesNon-conforming File ValidationFiles>Import/Export Naming Standard*Improvements to ISO File and Folder Operations*Open and Edit DWG with AutoCADReviews | Add Custom Attributes to WorkflowsCost Releases>Cost Management>Enhanced Document Review Functionality**Issue to Potential Change Order (PCO)Project Management Releases>Submittals>Import EnhancementProject Home Support on MobileUpload Attachments from Files or from ComputerRFIs>Roles and Companies as UsersShort RFI Creation on the mobileMeetings | Upload AttachmentsSchedule>Add Cost referenceEnhanced iOS supportQuality & Safety Management Releases>Issues | Add Reference to Submittals, Forms, PCOsStandardization Releases>Bridge>Automatic Sheet SharingImport FunctionalityLibrary | Search & SortData and Intelligence Releases>Dashboards>Additional Partner Cards*Send Dashboard as Reports*Unified Account Level UI Enhancements*Data Connector>PhotosProgress Tracking DataReports>Issue Summary and Issue Detail Filtering by Custom AttributeLogo ManagementSubmittals | Report EnhancementsProject Closeout and Handover Releases>Assets>Bulk Edits on Web & MobileRFI ReferencesSchedule ReferencesHandover | Files & Issues in As Built Export

* = features on both Autodesk Construction Cloud unified platform & BIM 360

** = features in both Autodesk Build & BIM 360

*** = features in both Autodesk Build & PlanGrid

**** = Autodesk Docs feature (available across all unified products)

***** = features in both Autodesk Build and Autodesk BIM Collaborate

 

 

Highlighted Releases

 

Assets | NFC Support

In addition to using barcode / QR code scanning within the Assets tool of Autodesk Build, users can now use Near Field Communication technology to pull up detailed asset information. This saves teams time since they can simply set a device within range of the asset, and all asset related information stored within the PlanGrid Build mobile app will instantly appear.

Cost Management | Home Page**

Autodesk Build and BIM 360 Cost Management users now have access to a new Home Page within Cost Management, displaying an aggregated calendar view of important dates across the system for increased visibility.

Cost Management | Expense Photo References

Autodesk Build Cost Management users can now add photo references (e.g., delivery tickets, receipts, etc.) to expenses, ensuring accounting has what they need to process payments.

RFIs | Step Back From Manager to Subcontractor

This feature allows RFI managers to request additional information from subcontractors by sending the RFI back to the sub. This release helps to speed up the RFI workflow by making sure necessary changes are made in a timely manner.

Schedule | Suggestions [coming soon]

Users with the right permissions can now submit update suggestions on an activity to the schedule manager, improving communication across stakeholders. The schedule managers can review, approve or reject the suggestions. The schedule manager must update the master schedule in the schedule authoring tool to ensure the latest schedule is imported into Autodesk Build.

Submittals | Review & Annotate PDF Attachments

Autodesk Build users now can view and annotate submittals, such as adding an approval stamp (image stamp), text, arrow, cloud, highlighter and various shapes directly in Autodesk Build. This enables a faster and more efficient review process.

 

Document Management Releases

Desktop Connector | Non-Conforming File Validation*

Autodesk Construction Cloud unified platform and BIM 360 users now have the ability to select specific files, and put them through the naming validation tool to rename them in order to meet the project’s naming standard in Docs.

Desktop Connector | Right-click to Rename Files*

For any file, a user be able to right click and rename a file from Desktop Connector without needing to navigate to Docs in the web browser.

Files | Import/Export of Naming Standard*

As a project admin setting up the naming standard on a project, the admin now have the option to export a .xlsx template. They can also make adjustments to the naming standard attributes in MS Excel for ease of use and import to a single project or multiple projects.

Files | Improvements to ISE File & Folder Operations*

Autodesk Construction Cloud unified platform or BIM 360 users can now take advantage of ISO naming standards validation when moving or copying files from enforced to enforced folders​ and when making a file “current”​. Additionally, users can now have their search results be a method to organize files for selection to move or copy to an enforced folder.

Files | Open and Edit DWG with AutoCAD (web app)

From within Files, users can now right click on a .dwg file type to open the drawing within the AutoCAD web app, exposing the use of native AutoCAD tools (viewing and editing). NOTE: Once the file is clicked, a new tab is opened, exposing the AutoCAD web interface.

Reviews | Add Custom Attributes to Workflows*

The project admin can now add custom attributes to a workflow so that each review initiated has the custom attribute columns for the approve to complete as needed. Note: For BIM 360 users, only projects created after Mar 23, 2021 will have this feature.

 

Cost Releases

Cost Management | Enhanced Document Review Functionality**

Autodesk Build and BIM 360 Cost Management users can open and edit Microsoft Word documents online directly from the document package section within the items details flyout panel, enhancing and accelerating the document review processes.

Cost Management | Issue to Potential Change Order

Expanding on the ability to create a Potential Change Order (PCO) from an RFI or Submittal Item, Autodesk Build Cost Management users can generate a PCO directly from Issue. Continuing to help teams capture the origin of change orders.

 

Project Management Releases

Submittals | Import Enhancements

During the upload process, Autodesk Build users get a new processing loader which can be referred to as a progress bar. This release supports a friendlier and more transparent import process.

Submittals | Project Home Support on Mobile

Users can now view a submittals work status card on iOS & Android. This allows access to critical and actionable information faster from any device at any time.

Submittals | Upload Attachments from Files or from Computer

Autodesk Build users can select up to 10 existing files from Autodesk Docs and attach it to the specific submittal item. Now, Document Management and Project Management workflows are even more connected.

RFIs | Roles and Companies as Users

Within each RFI, all roles and companies can now be specified as a watcher or co-reviewer. This release improves ease of use when creating, editing, or assigning RFIs.

RFIs | Short RFI Creation on Mobile

Users have the option to create an RFI by simply filling out the information for three fields: RFI title, question, and photos. This feature allows users to save time on RFI creation in the field.

Meetings | Upload Attachments Directly from Computer*****

Users can upload and remove attachments directly from their PC. Attachments can be added at a meeting or at an item level. This ensures up-to-date information is shared and reviewed during the meeting.

Schedule | Add Cost reference

Users can reference cost items from the cost management tool to an activity in schedule.

Schedule | Enhanced iOS support

iOS users can filter schedule information by Activity codes/ Outline codes imported from the schedule authoring tools. Allowing teams to find the right information, faster.

 

Quality & Safety Management Releases

Issues | Add reference to submittals, forms, PCOs

In addition to the existing ability to link photos, files, RFIs and assets, user can now also add a reference to submittals, forms and PCOs, directly from the issue. This way, teams ensure even more of the issue’s context gets captured.

 

Standardization Releases

Bridge | Automatic Sheet Sharing

As a follow up to the ability to share sheets across accounts (released in July 2021), team members can now specify certain sheets that they are sharing to automatically update when a new version is published. This ensures teams, even if they are from different companies or using different accounts, are always looking at the most up to date sheet information. NOTE: We are currently working on building up the feature functionality of the Bridge tool. Please watch for more enhancements to Bridge in future releases.

Bridge | Import Functionality

Within the ‘Incoming’ tab of Bridge, Autodesk Build users see a new option to ‘Import’ and select sheets from other projects, in which they are also a member, to add to their current project. This improves cross-team and cross-project collaboration, and gives users the ability to surface relevant information to their teams. NOTE: We are currently working on building up the feature functionality of the Bridge tool. Please watch for more enhancements to Bridge in future releases.

Library | Search & Sort

There is a new search bar as well as the option to sort within the account level library in the Autodesk Construction Cloud unified platform. This makes it easier to find library components so that teams can use consistent practices and drive standardization across all projects.

 

Data and Intelligence Releases

Dashboards | Additional Partner Cards*

Both Autodesk Construction Cloud Unified Platform and BIM 360 users now see new partner cards for Aespada, DAQS.io, Embneusys, Geometrid, Oculo, Pronovos, Safe Site Check In, Structshare, Viact.ai, and WakeCap.

Dashboards | Send Dashboard as Reports*

Both Autodesk Construction Cloud unified platform and BIM 360 users can now share data from a dashboard within Insight as a PDF report to any external team members. A great example of this is if a general contractor wanted to share a dashboard view with an owner who did not have an account. This broadens visibility into project data and allows teams to create custom dashboards and easily share relevant views. Note: PDF reports of dashboards do not include partner cards in this initial release.

Dashboards | Unified Account Level UI Enhancements*

From within the Executive Overview dashboards within Insight, both Autodesk Construction Cloud unified platform and BIM 360 users now see a consistent UI to help indicate that all projects shown on this overview list are pulled from projects across both BIM 360 and ACC. This ensures that executives see a holistic view of all projects, regardless of the product used, and help improve the migration experience.

Data Connector | Photos Data

Autodesk Build users can now extract Photos data using the Data Connector. This is especially important to teams tracking quality and safety and wanting to see details around things like how many photos have been captured.

Data Connector | Progress Tracking Data

Autodesk Build users can now extract Progress Tracking data using the Data Connector. This gives teams the ability to create custom dashboards around the use of Progress Tracking and further analyze installation progress of objects on a project using other BI tools.

Reports | Issue Summary & Issue Detail Filter by Custom Attribute

Autodesk Construction Cloud unified platform users can now filter both the Issue Summary and Issue Detail reports by any custom attribute. This allows teams to run more specific reports that are catered to the way individual companies track issues.

Reports | Logo Management

Project Admins can now customize the logo that shows up on reports by either selecting the account logo or adding in a net new logo. This allows teams to improve the branding of their reports and provide clarity of ownership when sharing reports externally.

Submittals | Report Enhancements

From the Submittal tool, users will be able to generate both the detail and summary reports, and have the option to include specific submittal items when exporting the report. Report enhancements now also include a single item report that can be generated from the action menu. Users can also copy a public link to share the report from the panel once the report has been generated. These enhancements allow customers to have more flexibility when exporting submittal reports.

 

Project Closeout and Handover Releases

Assets | Bulk Edits on Web & Mobile

Within Autodesk Build or the PlanGrid Build mobile app, teams can now make bulk edits to a selected group of assets by simply scanning barcodes, QR codes, or NFC tags in sequence. This allows teams to better standardize information and make updates faster.

Assets | RFI References

Within the Assets tool flyout panel, teams now see an added reference option for RFI’s. This means that users can link a specific asset to an RFI, connecting information and making it more accessible throughout both the assets and RFI workflow. Note: Mobile functionality will come by the end of the month.

Assets | Schedule References

Within the Assets tool flyout panel, teams now see an added reference option for Schedule. This means that users can link a specific asset to schedule item which gives visibility into where an asset status is in relation to the broader project schedule. Having this level of visibility helps teams better plan and forecast dates. Note: Mobile functionality will come by the end of the month.

Handover | Files & Issues in As Built Export

Autodesk Build users can now export Files and Issues data as a part of the As Built Export tool. This adds to the RFI, Submittals, and Sheets download that was currently available and further improves the handover process by saving time, enhancing documentation accuracy, and improving owner satisfaction. Note: Files data will not be available until the end of November.

To see the full list of our latest updates across all Autodesk Construction Cloud, please check out this blog post.

 

Get the newsletter to hear about all our latest product announcements

Newsletter Subscription Banner

The post Autodesk Build Gets 25+ Product Updates, Features, and Enhancements appeared first on Digital Builder.

Construction Management

Digital Builder Podcast Ep 22: How Specialty Contractors Can Navigate Contracts & Get Paid On Time

In a perfect world, a contract should include a clear set of instructions that conveys well-defined expectations to all parties concerned. In reality, it’s often a monster document packed full of legalese that can be difficult to understand. This episode of Autodesk’s Digital Builder podcast addresses the most common challenges with contracts and how simple adjustments can ensure you fully understand what you’re signing. And of course, we cover steps to make sure you’re getting paid on time.

 

Listen to the episode now

(function() { var qs, js, q, s, d = document, gi = d.getElementById, ce = d.createElement, gt = d.getElementsByTagName, id = ‘soun_der’, b = ‘https://embed.sounder.fm’; if (!gi.call(d, id)) { js = ce.call(d, ‘script’); js.id = id; js.src = b + ‘/embed.js’; q = gt.call(d, ‘script’)[0]; q.parentNode.insertBefore(js, q);}})();

powered by Sounder

You can also listen to this episode on Apple Podcasts, Spotify, Stitcher, Google Podcasts, and anywhere else you get your podcasts.

 

On this podcast episode

Today’s guest, Karalynn Cromeens, Owner & Managing Partner at The Cromeens Law Firm, joins the show to share the steps everyone can take to make contracts more straightforward and less contentious.

We discuss:

The current state of construction contractsThe difference between secured and unsecured debtsHow to protect yourself when it comes to contracting and payment termsBest practices for handling change ordersConstruction technology and the future of contracting and payments

A contract should really be a tool to help everyone in the construction industry; it doesn’t have to be this monster document that you just hold your nose, sign, and hope for the best.” —Karalynn Cromeens, Owner & Managing Partner, The Cromeens Law Firm

 

4 tips for navigating contracts and getting paid on time

1. Understand the state of contracts and payment terms in construction

The current state of contracts and payment terms in construction leaves a lot to be desired, says Karalynn.

For starters, construction contracts have become increasingly complex, making it hard for all parties to get on the same page.

“The contract is supposed to be a clear set of instructions just like plans and specs, but it becomes this monster document that nobody understands and it’s not conveying expectations clearly.”

—Karalynn Cromeens, The Cromeens Law Firm

Karalynn also brought up the tendency of the industry to pass liability down the chain when drawing up contracts. Owners pass on certain risks (contractually) to general contractors, who may do the same thing when hiring specialty contractors.

These things are common in the AEC industry, particularly since construction professionals want to protect themselves when possible. However, these practices can create rifts in relationships and result in contentious situations.

For this reason, construction professionals must find better ways to craft and negotiate agreements. This starts with using contracts that people can easily comprehend.

“Let’s have a contract and ensure that everybody knows what it says,” says Karalynn.

She recalls her experience speaking with a fellow attorney who had to go through a 129-page subcontract that could have been cut down to ten pages.

“It’s all repetitive, it’s all legalese and there’s no reason for it. The contract should be a tool to help everyone in the construction industry understand the project’s requirements, deadlines, and terms. It doesn’t have to be this monster document that you just have to hold your nose and sign, then hope for the best.”

Karalynn also emphasizes the importance of negotiating who takes on certain risks and liabilities. “I’m not saying that the subs don’t take any liability or the general contractor doesn’t take any liability from the owner; I’m saying let’s negotiate. Let’s meet in the middle. Which is what it’s supposed to be.”

Taking these steps, states Karalynn, helps parties negotiate more equitable contracts and forge better relationships—something that’s crucial, especially since construction is such a relationship-centric industry.

 

2. Make sense of your contracts

The shifting of risk and liabilities is a very common practice when drafting contracts. After all, everyone is trying to protect themselves. That said, contracting can be done fairly so that relationships aren’t taken advantage of, and risk isn’t pushed downstream.

As the host of “Quit Getting Screwed,” a podcast that focuses on helping contractors build better businesses, Karalynn is well-versed in construction contracts and she offers valuable advice to help contractors understand the agreements that they’re signing.

Know the different types of contracts

There are different types of contracts drawn up between owners, general contractors, and specialty contractors. According to Karalynn, contractors must understand these various documents and how they relate to each party.

First, there’s the prime contract, which is the agreement that sets the terms between the owner and GC. The GC then hires contractors, which is where the subcontractor agreement comes into play.

This subcontractor agreement often “relegates the terms of the prime contract,” says Karalynn.

“What has happened and what has been happening as long as I’ve been reading subcontracts is on the first page of the subcontract, there’s a line that incorporates the terms of the prime contract. So these subcontractors, specialty contractors, or trade contractors are going to be held responsible and liable to the terms of the prime contract.”

The issue, she says, is that subcontractors often don’t see the prime contract so they don’t know what the document says and they’re unable to negotiate its terms.

Karalynn says it’s important for subcontractors to get ahold of the prime contract so they can understand exactly what they’re agreeing to.

Another common type of agreement is the Guaranteed Maximum Price (GMP) contract.

“What this tries to do is shift the risk of material price increases to the general contractor, and then from the general to the subs.”

The GMP contract can cause challenges if it doesn’t allow contractors to increase what they’re charging when material costs rise. For this reason, contractors need to be careful with the GMP agreement and negotiate terms to protect themselves.

Be aware of the “pay when paid” clause

Karalynn recommends being mindful of the “pay when paid” clause, which essentially means subcontractors won’t get paid until the GC is paid by the owner.

“So if you’re a subcontractor and you do the best outstanding job in the whole world and the GC tells you what a great job you did… That by itself is not enough to get paid if you have a ‘pay when paid clause’. You are relying on something to happen that you have no control over.”

She continues, “the owners [have] to pay the general contractor before the general [contractors have] the obligation to pay you, the sub. So really, if you sign a subcontract with a ‘pay when paid’ clause and you don’t negotiate, you should really have enough cash on hand to float that whole contract amount just in case.”

In these instances, you should negotiate and try to split the risk, says Karalynn.

“You can say, ‘If the GC is not paid by the owner within 30 days and it’s not my fault, you’ll pay me 50% of the payout. At least I can pay for my guys and I can make it a little longer without getting paid.’”

—Karalynn Cromeens, The Cromeens Law Firm

 

3. Learn how credit works in construction

The construction industry runs on credit. Owners often take out loans to fund projects, and they are extended credit to be able to do that. A similar thing happens with subcontractors, especially those working with a “pay when paid” clause.

As Karalynn puts it, “subcontractors and material suppliers supply the labor, supply the material and wait to get paid. And that is credit. You are owed a debt. So, if you work and wait to get paid you have extended credit.”

To ensure that you get paid, you need to understand the difference between unsecured and secured credit. Unsecured credit means the debt is not tied to any collateral. You can collect on the debt by taking things to court, obtaining a judgment, and finding assets to collect the amount owed.

Secured credit, on the other hand, is backed by collateral. A home mortgage is a common example of secured debt. Mortgage companies let buyers obtain a loan to purchase a house, and they hold the property as collateral.

“A mechanic’s lien works the same way,” says Karalynn. “If you do it right in your state and you file it on a project, you are now a secured creditor. The amount that you’re owed for labor and materials is secured by the property that you supplied them to.”

She adds, “You still have your unsecured debt claim against the GC or whoever hired you, but now you have a security interest in the property to the extent that you’re owed money for labor and materials supplied.”

 

4. Ensure you’ll be paid on time

While laws vary from one state to the next, there are a number of universal tips that you can implement to negotiate contracts and ensure you get paid on time. Here are Karalynn’s top recommendations.

Don’t just sign a contract—make sure you understand it

Even if you don’t want to negotiate, Karalynn says it’s worth having an attorney or legal professional break down what the contract means. “That way, you know what you’re agreeing to and you know what’s expected.”

At the very least, you must “understand what you’re agreeing to, and then you can go from there,” says Karalynn.

She continues, “Please, don’t just sign the contract. From my experience, the subcontract that comes over is the first offer. It is like paying the sticker price for a car. No one does that. And I think part of why subcontracts are in the state that they are in now, is that attorneys draft things that are the best for their client thinking that there’s going to be a negotiation. But subs were so afraid of not getting the work that they just signed the contracts, and now there’s a standard out there that’s one-sided.”

Get your change order costs covered

Karalynn says subcontractors must understand the change order provision in their contract and then negotiate before signing.

“What I like to do in my contracts is, if we can’t agree on a price, we’ll do costs plus a percentage—e.g., 15%, 10%, or whatever is agreed upon. That way, we don’t have this long, drawn-out negotiation.”

—Karalynn Cromeens, The Cromeens Law Firm

“What I like to do in my contracts is, if we can’t agree on a price, we’ll do costs plus a percentage—e.g., 15%, 10%, or whatever is agreed upon. That way, we don’t have this long, drawn-out negotiation. We just build in, ‘Okay. I’m going to give you a price. If you don’t like it, here’s the alternative.’”

Another tip? Before doing the work, have the actual change order form drafted and ensure that the costs for the work are outlined clearly. You also need to assure that all parties have signed it before working on the changes.

“Where most people get into trouble is that they don’t get it signed or they submit it after they do the work. When that happens, you’re just in somebody’s good graces to sign it for you because you’re really not going to get paid for that extra work if it’s not on a written change order,” says Karalynn.

ccount for market volatility

With material prices being so volatile right now, Karalynn says contractors and subcontractors need to account for increases in material and labor costs.

According to her, “you need to put on there that if the material prices escalate more than 2% or 3%, you’re going to be able to change your bid for that.”

“I also have guys that are putting shorter timelines on their bid—like 30 or 60 days—and if it’s not accepted by then, the bid is withdrawn. That’s just because the market is so volatile right now.”

Do an itemized bid

Always do an itemized bid, advises Karalynn. “You don’t want to just bid the whole scope and miss something and then you’re on the hook to do it. Because once you put a bid out there into the world, it is an offer that can be accepted. And once it’s accepted, you’re held liable to those terms.”

Another thing to keep in mind is that your bid can be different from the actual scope of the project. You need to remember that you’re not hired to do your bid, you’re hired to do the scope.

As Karalynn points out, “your bid no longer describes the work you were hired to do. The scope attached to the contract does. If those two things are different, you’re still held to the scope. So one of the things I tell my contractors is to read the scope as if it were a new project and make sure you get the same price.”

Utilize technology to save on attorney fees

Karalynn is all for using technology to help contractors put together contracts and make sure they get paid.

“There are so many great platforms out there that allow you to do everything electronically. A lot of times, you don’t get paid on time because not everything is in there or it’s not submitted correctly so that pushes you back another month. Technology helps eliminate all that. It has everything all in one place.”

Karalynn adds that technology not only helps attorneys do their jobs more efficiently, it could even lower your legal bills.

“I appreciate it so much as a lawyer that I don’t have to go through banker boxes looking for all the paper documents that go with a particular job. If I’m looking for something, I can search by keyword. It saves you so much in attorneys fees too, because I don’t have to spend time searching.”

 

Final words on contracts and timely payments

Navigating the realm of construction contracts, costs, and risks can be tricky, but understanding these things is key to getting paid on time. Before entering into an agreement, be sure to read and fully understand the terms of the contract, so you can negotiate accordingly.

Doing that is no easy task, which is why Karalynn says it’s extremely helpful to have “an attorney that’s a phone call away.”

“I don’t think people realize how much legal crosses over into the construction world. And often, you need somebody that’s going to answer the phone right away. You can’t wait two days, you can’t wait a week to get an answer. I think an attorney on call that is familiar with construction is a priceless tool in your toolbox.”

 

New podcast episode every two weeks

Autodesk’s Digital Builder podcast is hosted by me, Eric Thomas. New episodes go live every two weeks.

If you need to learn additional contracting and negotiation tactics, catch the full podcast episode of Digital Builder to hear more from Karalynn.

Listen to the Digital Builder Podcast on:

Apple PodcastsSpotifyStitcherGoogle Podcastsor wherever you listen to podcasts

The post Digital Builder Podcast Ep 22: How Specialty Contractors Can Navigate Contracts & Get Paid On Time appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1133

Construction Blogs

Manage Changes, Don’t Let Them Manage You

Nowadays, it’s not uncommon to be inundated with information highlighting the importance of collaboration and communication in design and construction projects. Naturally, most teams, if not all, have the goal of being proficient in these areas given that it’s key to successful outcomes and maintaining profit margin. However, it is also common for architecture and engineering, as well as general contracting firms, to struggle with precise and timely communication of changes.

An uncommunicated change in the design phase can cause several weeks’ delay resulting in thousands of dollars wasted. The further along the change goes unrecognized the greater the impact with potential outcome leading to stop construction for redesign, and on average of 35% of all construction projects will have a major change, according to Project Analysis Group. To help eliminate these challenges, it is recommended to implement change management. Effective change management enables better coordination leading to less risk in design, and improved quality in construction.

 

Change management with the Change Analysis tool

The Design Collaboration module in Autodesk BIM Collaborate offers the Change Analysis tool, which enables users to understand the design changes incurred on their projects. Teams can establish watch groups to closely monitor changes, configurable based on user criteria.

For example, a user can select watch groups for teams, models, or objects. Once a watch group is configured, the Change Analysis tool will share notifications automatically to the group about any changes impacting assets relevant to the group. Effectively making it easier to keep up with designs in continually evolving projects.

 

Change Analysis tool and watch groups in action

So, how does this show up in the real world? Here are a couple of cases studies where the Change Analysis tool and watch groups could have helped prevent negative outcomes.

Scenario #1: Design Phase

Consider an architect working on the design of the façade in a new building. The structural engineer on the same project decided to change the floor slabs, reducing them from 20 to 10cm from the façade edge because less space was needed for rebar.

This change looked pretty similar in the plan, but now the designed facade is 15cm distance from the slab causing a 5cm gap. The design team is using Design Collaboration to share information, but because there was no change management or watch group established, the change was missed when sharing the models with the greater team.

Eventually, when plans went to the main contractor, they realize the problem between the slab and the façade, but it’s too late. As a result, the design had to be updated leading to a 2-week delay.

If change management was implemented in this scenario, when the structural engineer’s new BIM Model was uploaded in Design Collaboration with the new slabs (and new dimensions), the architect would have automatically received a notification that something has changed, since the architect created a slab watch group. This change notification would have prompted the architect to go back to the design, and adapt the façade line to meet the new slabs design. Now, when the information is sent to the main contractor, the design is of much greater value because it’s inclusive of changes—which, in turn, reduces or eliminates delays.

Scenario #2: Preconstruction

Similar to the design phase, change management is equally important to the preconstruction phase. Consider a client went for a site walk, and requested a change to add a door to the facilities room. The architect made the change, and communicated it to the blockwork subcontractor to add the door on site. The architect also updated the drawings, but did not communicate the change to the broader team.

As a result, during model coordination the blockwork in the facilities room was set up as “frozen design”, and the services team were given the green light to start the manufacturing drawings. Because the architect did not communicate the change to the broader team there was no clash, and coordination ultimately missed this change.

This miss required a change order to be made for the design to be redone. New materials had to be ordered to site, and the removal and reinstallation had to be done delaying the project; costing time and money.

How could this negative outcome have been avoided?

In this scenario, it would have been recommended for the services team to create a watch group with the blockwork; let’s say they named the group “Blockwork Frozen”.

While the services team were working in the design, a notification would have appeared in Design Collaboration of a new model from blockwork with a change in the specific area that was “frozen”. The services team could have then requested more information from the blockwork subcontractor and client before going into manufacturing and installation. This approach would have resulted in no delay or unforeseen costs.

 

New features for change management

As depicted in the earlier case studies, it is imperative to establish a strategy for change management. The Change Dashboard in the Change Analysis tool provides users with a single view pane where they can see the changes as well as dive into details about those changes—giving immediately useful insight and flexibility in design. To further improve the Change Analysis tool, Autodesk just released a few new features:

Comparison of non-consecutive versions allows users to compare any two design versions of a project against one another. This benefit being the ability to track scope change, understand decisions made, and reference outdated designs. This gives the team more power to easily track how a project changes over time.

New viewer experience permits users more control on the comparison workflows and transparency in the selections of models for the viewer. It also offers flexibility to see changes by discipline with the object tree and flexibility to see changes with multiple attributes selected.

Filter improvements have been made to enable users to more easily see different changes by project attributes as well as provide a better experience overall when filtering. Users can now filter by discipline, modification type, and category. Users can also take advantage of the search function that permits filtering based on names of specific objects.

With the Change Analysis tool and these new features, users can now take even more control of the outcome of their projects, de-risk deadlines, and reduce waste. Considering from 2012 to 2015, just 25% of projects came within 10% of their original deadlines, having a tool that helps to mitigate unforeseen delays is critical.

During design and construction of buildings, making changes is an inevitable part of the process. The Change Analysis tool in Autodesk BIM Collaborate has been defined and designed to help users make sense and stay on top of all changes. It makes it easy to find and identify changes with automatic notifications, and the user interface improvements make it more intuitive for users to compare versions. Reach out today for a demo.

The post Manage Changes, Don’t Let Them Manage You appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1116

Construction Blogs

Key Takeaways from Construction Cost Management Report by Dodge

Cost management is key to ensuring construction projects stay on budget and on schedule. Yet many projects, as many as 33% come in over budget, as reported in the Construction Cost Management Report by Dodge Data & Analytics (Dodge). Surveyed contractors note that even among their best-performing projects, one out of five does not meet the budget requirements. 

Efficiently tracking construction costs and monitoring risks make a big difference in maintaining budgets. Tracking costs and monitoring risks, however, requires a strong cost management discipline. Insights into current cost management practices can help fine-tune practices to build discipline. In this article, we’ll review highlights from the report and key takeaways to drive your cost management discipline. 

Key takeaways

Owners and general contractors alike prefer a single primary tool for cost management, complimented by a limited number of third-party tools.Forecasting costs with real-time field data is the top future need for cost management.Alignment between owners and general contractors is critical to building an integrated cost management discipline, and revealed as an opportunity for both project teams and solution providers.Project-focused staff shows higher capability of being involved in cost management on a more holistic level. One reason is due to the ease in which technology allows this to happen.

 

Owners and contractors prefer a single cost management tool, yet most use more than one

Overall, owners, general contractors, and specialty contractors use more than one tool for cost management. Forty-four percent leverage more than one tool but lean on one as their primary. Thirty-three percent use two to five tools with none as their primary. Only 21% use one tool alone, while 5% use more than five tools with none as their primary. 

For respondents in project-related roles, there is a strong preference for using a primary technology tool for cost-management-related challenges such as establishing a system of cost accounts, status reporting during a project, and identifying areas of the project that require more attention in real-time. 

For best results from a primary cost management tool, prioritize ease of access and use.

We can see a consistent preference for having a primary cost management tool, yet just over a fourth of owners and contractors actually use one tool alone. The leading approach to construction cost management relies on a primary tool with supporting tools. For that reason, it’s important to choose a primary tool that allows you to connect your project data to cost activities and schedules. Integrations factor in here too to connect the field and office teams while avoiding data silos. 

For best results from a primary cost management tool, prioritize ease of access and use. These solutions should connect to schedule and cost activities over the lifecycle of the project. 

The Dodge report also indicates a preference for third-party tools among respondents. About 47% use third-party tools, with around 60% leaning on desktop applications and 40% using cloud-accessible ones. Thirty-two percent of owners and contractors use internally developed tools, and 16% use spreadsheets. 

We’ll likely see the number of people using internally developed tools and spreadsheets decrease in the future due to the customization capabilities of third-party tools and the maintenance costs of homegrown solutions. Organizations can generate better cost-related outcomes for all involved partners by focusing on using fewer, more comprehensive tools that engage all stakeholders in a shared approach to cost management. 

 

Success criteria for cost management solutions: what owners and general contractors expect

When measuring cost management success, respondents indicated that they use the following three metrics most frequently:

Turnaround time on processing change orders/variationsAchieving expected profit marginFinal cost compared to budgeted cost

Owners and contractors are split evenly on the subject of spending levels on cost management. Thirty-nine percent believe they are spending more than they should have to, 32% think they are spending the right amount, and 29% say they’re spending less than they should. In the subgroups, variation exists with owners more likely to believe they’re spending too much, especially those in public entities (55%). Contractors, on the other hand, especially those in trades, are the least likely to believe they are overspending (31%). 

There is also a significant amount of variation between how owners and general contractors measure the success of cost management solutions. Owners cite the following metrics most frequently:

Final cost compared to budgeted cost (30%)Generating useful data to benchmark for future projects (26%)

In comparison, contractors pinpoint minimal unplanned changes as their top success criteria. These preferences align with the responsibilities of each role but also indicate a lack of synergy on what successful cost management means. 

 

Forecasting costs with real-time field data in top future need for cost management

Respondents selected the most critical future need from 14 cost management practices. Thirty percent selected forecasting critical costs with real-time field data as the most important to improve over the next three to five years. This practice ranked number one across all four regions studied, with the United Kingdom selecting it most frequently (32%) and Canada choosing it least frequently (26%). 

Other top future needs were dynamically tracking each dollar in budgets (29% overall) and managing collaborative workflows (26% overall). As with other areas surveyed, we can see variance between the subgroups. Owners are most interested in dynamically tracking budgets and using field data for forecasting. These are two cost management practices that are also beneficial to contractors. 

Three times as many contractors (compared to owners) want to improve their future estimates. Twice as many want to benchmark cost performance. Again, these two practices are beneficial to owners yet appear to be more pressing needs for contractors. 

 

Project teams could be more involved in cost management

One area of opportunity for construction firms is the greater involvement of project teams in cost management. The report emphasizes the ability of these teams to participate in an integrated approach to cost management. Dodge’s findings “indicate that project-focused staff are ready and able to participate in a more holistic and integrated approach instead of the traditional office-based function with just discrete, periodic inputs from the field.” This was made evident by project-based staff reporting:

Higher levels of cost management capabilitiesLower levels of difficulty with their most challenging cost management activitiesGreater satisfaction using technology to address them

These responses indicate a significant opportunity to improve cost management practices by involving capable, skilled staff in the process. Doing so will help to integrate the practice into a firm-wide discipline. 

 

Owners and contractors have opportunity to align more

In the Dodge report, there are notable differences in priorities for owners and general contractors. For example, contractors note improving cash flow as a top need. Yet owners are more focused on improving their ability to forecast critical costs with real-time data from the field. Both of these areas require involvement from owners and general contractors. For example, cost flow contributes to the owner’s overall project health, and forecasting critical costs requires contractor participation. 

Variations like the one mentioned above represent a need for greater owner and general contractor alignment. Getting on the same page about cost management success, tools, and priorities will power leaner construction and smoother workflows throughout all phases of a project. 

 

From cost management insight to action 

To move cost management forward, owners, contractors, and project staff need a comprehensive tool they can rely on to centralize and improve the visibility of related cost activities and risks. This tool should be equipped with capabilities to support the future top need of forecasting costs in the field with real-time data.

We understand how important an integrated, collaborative cost management discipline is to the health and success of your projects. If you’d like to see Autodesk Construction Cloud’s cost management offering,please contact us for a demo. We’d love to show you around.

The post Key Takeaways from Construction Cost Management Report by Dodge appeared first on Digital Builder.

Construction Blogs

Join Autodesk at The Buildings Show: A Construction Trade Show

From December 1 – 3, Autodesk will be a proud sponsor at The Buildings Show in Toronto, one of North America’s largest construction trade shows. We’ll be hanging out on the trade show floor with a 20′ x 20′ booth and also presenting on the Demo Stage about our unified platform. The event is being held at the Metro Toronto Convention Centre and we’d love to answer all your Autodesk questions (and give you some good swag in the process).

The host, Buildings Canada, brings together a world-class construction, building and real estate network of the most established and reputable industry experts. Attend and you’ll enjoy speaker sessions, product demos, innovation awards, valuable education, and more.

The Buildings Show details

Date: December 1 – 3, 2021

Trade show hours: 9:30 am – 5pm ET & Friday 9 am – 1pm

Location: Metro Toronto Convention Centre

South Toronto, Canada

You can register here.

Don’t miss our presentation

One Source of Truth: Autodesk’s Unified Platform Build

Wednesday, December 1 – 11:30am to 12:00pm

Thursday, December 2 – 11:30am to 12:00pm

Autodesk Build delivers a broad, deep, and connected set of field execution and project management tools for builders in a single software platform that is easy to deploy, adopt and use. In our sessions, hear about Autodesk’s vision for construction management software and learn how Autodesk Build delivers field collaboration, project management, as well as document management, cost controls, turnover and insights… all managed together. 

Find us on the floor

Make sure to visit us at booth #1613. Our 20’ x 20’ booth will be stacked with swag giveaways, raffles, and Autodesk experts ready to field questions. You also won’t want to miss Phil Deutsch, an amazing mentalist who will be entertaining visitors at the Autodesk booth on Dec 1 from 11:30 – 1 pm. 

What is The Buildings Show?

From the event’s website, “Design, architecture, construction, renovation and property management professionals, experts and suppliers have come together at The Buildings Show, consisting of Construct Canada, PM Expo, HomeBuilder & Renovator Expo and World of Concrete Toronto Pavilion, for over 30 years. Get unparalleled opportunities to learn, lead and empower with cutting edge educational programming, product showcases and networking opportunities in a safe and secure environment.”

Why attend The Buildings Show?

From the organizer’s website, “The Buildings Show provides an unforgettable experience as North America’s largest event for products, services, educational programming and professional networking.” Buildings Canada is “proud to host this spectacular event for the design, construction and property management communities for over 30 years.

“You’ll expand your knowledge base, become a leader in your field and earn continuing education credits from BOMA, OAA, BSSB, CAHPI and ARIDO. The Buildings Show will provide opportunities and solutions for the industry to transact, learn and engage year-round through hybrid, online and in person experiences.”

How is The Buildings Show handling safety?

“The health and safety of attendees, speakers, exhibitors and partners is top priority. We will continue to closely monitor the situation around COVID-19 and will update you across our channels. For more information about Health & Safety protocols in place, please click here

“Proof of vaccination will be required to attend the in-person event.

Want to attend The Buildings Show?

You can register here. It’s an event construction professionals from around the globe make a point to attend and we’d love to see you there.

The post Join Autodesk at The Buildings Show: A Construction Trade Show appeared first on Digital Builder.

Did you miss our previous article…
https://www.dennis-construction.com/?p=1097

Construction Services

Construction Data: How to Make it Valuable & Accessible to AECO Stakeholders

The construction industry isn’t short on data. In fact, every project creates massive amounts of construction data from design and planning to turnover and beyond. Yet one of the most significant challenges faced by stakeholders is accessibility to the most important data right when it’s needed. This step is critical to uncovering insights and powering better decision-making. 

So how do we make critical project data accessible through the entire AEC lifecycle to the teams and individuals who need it most? Lauren Collier, Business Leader Project Technology/VDC at SSOE Group, and Sunny Manku, Technical Solutions Executive at Autodesk explore this very question in the Autodesk University 2021 session, Data in the AEC Lifecycle: Using Data to Better Connect AECO Stakeholders

We’ve gathered highlights from their session, including why a data initiative—and subsequently a unified platform—is paramount, the benefits of gathering data throughout the project lifecycle, how to best prepare your firm to succeed at data analysis, and more. Let’s explore their recommendations for making the most of data through the entire AEC lifecycle. 

 

1. Understand the need for a unified platform

To make data accessible and meaningful to decision-makers, you first must understand the value of capturing project data in a unified platform. 

For starters, what is a “unified platform”? A unified platform connects people, data, and workflows together throughout each stage of the project lifecycle for comprehensive construction project management. 

The next question: What makes a unified platform so powerful? It’s the technology that connects with and moves your strategy forward. As Lauren explains, “ Technology shouldn’t just be the driving force to your strategy. Technology should be that accelerator. It’s that integrator. It’s the glue that allows you to really get your strategic initiatives done.”

“Technology shouldn’t just be the driving force to your strategy. Technology should be that accelerator.”

Lauren Collier, Business Leader Project Technology/VDC, SSOE Group

A unified platform also provides a single source of truth to rely on. Often referred to as a common data environment (CDE), this isn’t merely a list of APIs connected to a SaaS solution. Instead, it’s a type of construction management software that provides access to data and tools that designers, engineers, and builders need. Furthermore, a unified platform enables third parties and customers to create and share their own purpose-built solutions whenever, wherever, and however they need. 

When data lives in one place, you have the ability to break it down across design, planning, building, and operating. As Sunny puts it, this opens up “an opportunity for all stakeholders, regardless of what they’re doing in the project, to be able to collaborate effectively in one place.” Stakeholders not only have the confidence that data is living in one place, but they can also pay attention to version controls and review past decisions made on the project in earlier stages. 

A unified platform should play an active role in coordinating how products work together, rather than just allowing you to exchange data with other applications. The data exchanged must flow seamlessly and bidirectionally across all capabilities within the platform. By doing so, users receive a productive, intuitive experience that drives much more effective workflows. 

 

2. Connect costs and schedules to project data

Cost certainty is an important part of setting expectations and delivering a great project outcome. By picking the right unified platform, you’ll find budgets are easier to manage because you’re more effectively connecting cost activities to schedule with real-time project data. When you stay on schedule and within budget, it’s no surprise that customers are happier and open to working together on more projects.

In addition, maintaining budgets and schedules is critical to maximizing profit margins. However, the construction industry is no stranger to delays, rework, and blown budgets. A recent Dodge Data & Analytics research report revealed that 66% of general contractors are carrying added costs from overtime shifts on at least three-quarters of their projects due to schedule slippage, with 50% of them needing to extend the project end date. Bad construction data is at least partly to blame for these statistics and adds up to $1.85 trillion in cost impacts to the industry globally. 

Construction data and technology both play major roles in maintaining budgets, schedules, and customer satisfaction.

Construction firms need a solid data strategy to overcome the impacts of bad data. In the Harnessing the Data Advantage in Construction report from Autodesk and FMI, proper data management is identified as being a significant competitive advantage in today’s fast-paced market. You can download the report for free to discover actionable steps for implementing a data strategy and access the useful checklist with the most most important steps.

Construction data and technology both play major roles in maintaining budgets, schedules, and customer satisfaction. Lauren elaborates on how data management fits into SSOE’s efforts, “We are more successful in our design effort and our value proposition to the client if we can coordinate that design, construction, and execution with no surprises. That’s really why [our] data initiative became very important to us.” This level of accessibility and coordination must be available at all phases of the construction lifecycle: designing, planning, building, and operating. 

To help avoid unwelcome surprises, the Schedule tool in Autodesk Build is worth checking out. This tool allows teams to collaborate, connect, and integrate with the most up-to-date schedule. Everyone has access to real-time information around the master schedule data in the field to work together seamlessly and efficiently. All of which helps prevent cost overruns due to schedule disruptions.

 

3. Unlock the potential for data analysis

Of course, one of the main benefits of a good data management strategy is a more confident analysis of the numbers, which leads to smarter decisions. SSOE uses Autodesk Construction Cloud products to provide greater context for all stakeholders and increase collaboration between design and construction. Hence, why Lauren is presenting on this popular topic.

Her team worked to better understand the potential for analysis through data architecture mapping. This exercise made the team realize they wanted to measure key performance indicators by connecting and consuming data. To do so, they decided to bring their data into a single source of truth through investment in Autodesk’s unified platform. This initiative also reflects SSOE’s commitment to respect in the workplace by fostering a culture of personal accountability. 

For SSOE, increasing respect and accountability is about reducing waste and increasing collaboration. “It allows for the whole team to kind of come together. It’s not these wasteful silos [sic] anymore,” explains Lauren, “It really is, ‘this is the place I go. This is the place I can consume information. This is the place I communicate. And this is the place that I report out.’”

 

4. Identify infrastructure and talent needs for full-lifecycle data management

Ultimately, making construction data accessible to AECO stakeholders really comes down to simplification. Firms often have multiple, complex systems producing and storing data. These systems may run effectively in the background but impede collaboration and analysis through their lack of connectivity, and thus a lack of practical usability. To better prepare your infrastructure for lifecycle data analysis success, Lauren recommends being selective about the tools and integrations you select to keep your tech stack simple and efficient.

From there, bring your internal and client resources into the picture. SSOE has leveraged its internal technology staff as well as clients in the digitization process. “Our clients have been very informative in this digitization process because there’s data they want to consume downstream. The easier that we can make that data easily accessible to them, we become a more valued partner.”

As you work with internal and external resources, consider which data skills you’ll need to prioritize. Having a strategy for upskilling your workforce will help to get more out of data and foster a more data-driven culture. For insights into what roles construction leaders expect to grow in importance,  this article sheds some light

 

Want to learn more? 

The most effective construction software platforms quickly and easily connect decision-makers to the data they need the most, when and where they need it. A unified platform is the first and most crucial step to data accessibility across the entire AECO lifecycle. From there, you can increase your results by implementing a data management strategy and encouraging your firm to analyze data by preparing your infrastructure and talent. 

If you need help finding the right unified platform, our team would be happy to help you unpack that. You can contact us here

 

The post Construction Data: How to Make it Valuable & Accessible to AECO Stakeholders appeared first on Digital Builder.

Construction Blogs

Top 10 Construction Companies in the U.S.

How the Biggest Construction Companies in the U.S. Are Building Our Cities & Workforce

As the U.S. works to bounce back from the pandemic, top construction companies are helping lead the way to recovery. Across the industry, you can feel the momentum in resilience, creativity, and the human spirit for problem-solving.

While spending has seen fluctuation lately, it’s expected to rise over the next several years. In fact, according to the U.S. Census Bureau, national construction spending is expected to exceed $1.55 trillion in 2021. That’s a 7.5% increase from 2020. Of that $1.55 trillion, $1.2 trillion is expected to go to the private sector, with much of the remaining funds addressing public needs. With the passing of a major Infrastructure Deal, official construction spending estimates may change. The deal is expected to generate about two million jobs per year, for the next ten years, with an emphasis on America’s physical infrastructure.

So, who are the largest construction companies leading the way? We’ve created a SlideShare of the top 10 construction companies in the U.S. to answer that exact question. Our list is composed of companies ranking on ENR’s Top 400 Contractors list. On the SlideShare you’ll find information about each company’s location, revenue, employees and year founded. Flip through below, then continue reading to discover insights about how a few of these top companies, and more, tackle some of the most common construction challenges. 

Top 10 Construction Companies in the U.S. 

10 of the Largest Construction Firms in the U.S.

Here are the top 10 construction companies in the United States as listed above in our SlideShare. 

1. The Turner Corp

Location: New York, NYEmployees: 10,000Revenue: $11.77 billionFounded: 1902

2. Bechtel

Location: Reston, VAEmployees: 55,000Revenue: $17.6 billionFounded: 1906

3. Fluor

Location: Irving, TXEmployees: 53,000Revenue: $19.166 billionFounded: 1912

4. Kiewit Corp

Location: Omaha, NEEmployees: 22,000Revenue: $10.3 billionFounded: 1884

5. The Whiting-Turner Contractin Co

Location: Baltimore, MDEmployees: 3,800Revenue: $6.2 billionFounded: 1909

6. Sto Building Group Inc

Location: New York, NYEmployees: 2,200Revenue: $4.9 billionFounded: 1971

7. Tutor Perini Corp

Location: Sylmar, CAEmployees: 10,000Revenue: $4.76 billionFounded: 1894

8. AECOM

Location: Los Angeles, CAEmployees: 54,000Revenue: $13.24 billionFounded: 1990

9. Skanska USA

Location: New York, NYEmployees: 7,600Revenue: $6.5 billionFounded: 1971

10. DPR Construction

Location: Redwood City, CAEmployees: 5,900Revenue: $5.94 billionFounded: 1990

How Top Construction Companies Approach 3 Common Challenges

Of course, with opportunity comes new obstacles. If you’re adept in problem solving, the following obstacles are exciting challenges that can give you a competitive edge if tactfully approached. For a better understanding of how you can approach three very common challenges in construction, we’ve provided examples of how top firms have succeeded in solving these problems.

1. Complex projects with tight deadlines

As technology improves, expectations rise as well. Highly technical projects require significant resource planning, forecasting, and attention to detail. Add in tight turnaround times and the obstacles only increase. Gilbane Building Company, ranked #11 on 2021’s ENR400, is one of the construction companies tackling challenges like this one head-on. 

The Rhode Island-based firm constructed a state-of-the-art engineering lab and academic facility for students at the Wentworth Institute of Technology (WIT) in downtown Boston, Massachusetts. This project was WIT’s first new academic building in over 40 years. 

Gilbane was brought in to construct the new four-story, 78,000-square-foot academic building for engineering innovation and sciences. They were on a short, 15-month schedule. In order to meet the tight turnaround and represent the polytechnic university’s focus on innovation, the firm leaned on cutting-edge technologies and processes. Specifically, Gilbane leveraged prefabrication, design-assisted preconstruction processes, and virtual reality (VR) to meet the deadline and high-tech requirements. 

Speaking to prefabrication as one of those crucial pieces to finishing on time, John Myers, Gilbane’s director of visual design and construction for New England says, “Off-site fabrication for us, from a safety standpoint, from a schedule standpoint, from the standpoint of being able to do things in parallel instead of in sequence, those are the things that make Gilbane successful.” For a deeper dive on this this impressive, yet challenging project, we recommend you read the full story here.

In the spirit of higher education, Gilbane also created a “living” classroom out of the project. It allowed WIT students to learn the most current and advanced construction methods as Gilbane went through the building process. Students got hands-on experience with each step of the project in real-time.

2. Identifying benefits of new technology in preconstruction

We’ve all heard the adage: “No one likes change.” It’s common for firms to face resistance to new technology and innovations. Usually, the resistance is not due to an individual’s resistance—it’s an organizational challenge. Improving structure and processes can be slow when the productivity and profit gains haven’t been fully understood by decision-makers. The truth is that technology proves to be an ally over and over again. We look at how two leading firms responded to different scenarios related to the need for new technology in preconstruction.

2a. Proving value of new technology with money saved

Multinational construction and development company, Skanska, ranked #9 on the 2021 ENR400, encountered some pushback from clients when moving from 2D to 3D modeling. The company decided to switch to 3D modeling for quantity takeoff to save time and money on projects.

The Skanska team has found that the best way to reassure hesitant clients is to provide proof of 3D modeling’s value. Kelsey Stein, National Preconstruction Technology Manager at Skanska explains, “By having better standards that we can give to the design team, it’s helped us perform a closer estimation while saving time and money on our projects.”

The 3D takeoff uncovered missing quantities that accounted for a 28% discrepancy….saving a tremendous amount of money that would have been lost under the traditional 2D method.

To provide greater context for clients, Skanska compared the results of a traditional 2D takeoff and a 3D takeoff using Assemble on the same project. The 3D takeoff uncovered missing quantities that accounted for a 28% discrepancy in the curtain wall scope. As a result, the firm saved a tremendous amount of money that would have been lost under the traditional 2D method.

2b. Building easy-to-use technology for your own employees

PCL, a construction company coming in at #14 on the 2021 ENR400, found themselves needing to create easy-to-use technology for their preconstruction managers—so they did just that.

Breaking out the challenge, PCL’s estimators and managers were adept at reviewing 2D drawings and managing the preconstruction process. However, the review of 2D drawings can be a very manual process and slow down workflows. This created inefficiencies. On top of that, preconstruction managers were regularly receiving more 3D models from the design team as they moved to digitizing their workflows.

Knowing they had to improve access to insights that 2D drawings couldn’t provide without significant effort, PCL created a multidisciplinary team to evaluate and identify their priority project KPIs. They determined which ones would be most effective at tracking design progress in real time and got to work building their own data management and interpretation tools. 

“Predictability is the name of the game when it comes to construction. If we can better track the progress of design, then there will be little-to-no surprises when we receive milestone design deliverables.” -Nick Kurth, PCL Construction Enterprises Inc.

Their team can now easily access critical, real time project progress data through Autodesk Assemble, Autodesk Revit and a Power BI dashboard. This technology enables them to better interpret data and generate cost-effective designs with the most efficient use of materials.

Nick Kurth, VDC Manager at PCL Construction Enterprises Inc, shares why the dashboard was so critical, “Predictability is the name of the game when it comes to construction. If we can better track the progress of design, then there will be little-to-no surprises when we receive milestone design deliverables. This dashboard solution is another means for us to drive lean principles around target value design. It’s also essential to have transparency between our design team and our precon team, and that’s a key part of what this provides.”

3. Having geometric & cost certainty

As a Fortune 500 firm and ranked #8 on the 2021 ENR400, AECOM is used to partnering with clients in the public and private sectors to solve complex construction challenges. The premier infrastructure firm is known for its construction and design-build approach, which leads to optimized collaboration, productivity, and efficiency. Under the design-build construction delivery model, contractors, designers, and owners collaborate as a team to meet owner expectations. 

AECOM America’s BIM Director, Russ Dalton, is responsible for helping the teams behind the firm’s construction and design-build approach win new business. He then supports them in making sure the projects are executed effectively. 

Technology is essential for helping Russ do just that. His team, and AECOM as a firm, has embraced BIM 360 to achieve geometric certainty and cost certainty. They’re now moving toward operational certainty. Through their commitment to achieving certainty, and the technology that enables it, AECOM has carved out a competitive advantage.

“We’ve witnessed a 32% increase in productivity with this methodology.” -Russ Dalton, AECOM America

AECOM’s Barclays Center Arena project was a testament to the effectiveness of how they use BIM 360. Russ shares, “We looked at [this project] through predictable lenses to make sure that in the construction process it could be completed with geometric certainty and cost certainty.” 

The $450 million project was not only finished early but came in under budget due to AECOM’s commitment to BIM 360. Russ says that the use of BIM 360 generated “$4.5 million in cost savings” on the project. He goes on to add, “We’ve witnessed a 32% increase in productivity with this methodology.”

The Road Ahead

These leading construction companies are showing the industry, and the nation, what’s possible on the road ahead. They’re also highlighting that it takes innovation, persistence, and the right tools to not only survive, but thrive in the face of challenge. Remember, obstacles are opportunities and the best days are ahead for our industry. Technology is helping us get there.

The post Top 10 Construction Companies in the U.S. appeared first on Digital Builder.

Construction Management

A Practical Guide to Construction Accounting Software

Construction accounting software is a must-have, but may seem daunting to implement new solutions if your accounting technology hasn’t kept up with the complexities of your growing business. Managing the myriad of accounting activities across an entire construction business, or at any phase of an individual project, you’re going to want access to the most accurate, real-time numbers possible.

No stranger to disruption, the construction industry is experiencing higher levels of digitization than ever before. The pandemic has accelerated digital transformation by as much as seven years according to some experts. Technical tools and solutions are making some of the most complicated and manual practices in construction a concern of the past. 

That includes accounting. Sure, accounting may have a bit of a reputation for being mundane. But the latest innovations in construction project management software provide an exciting level of financial clarity—especially useful to connect project finances to accounting decision-makers. If you’re exploring options to make construction accounting more efficient and accurate, you’ll find plenty of helpful information on choosing the right software below. 

The Basics of Construction Accounting & What Makes It Different

At its most basic level, accounting helps businesses understand and capture accounting activities. It’s essential to business administration, management and financial reporting. Sometimes referred to as the “language of business,” accounting personnel document an organization’s accounting activities to accurately measure financial performance. This information is then communicated to owners, investors, creditors, and regulators. It will also dictate who you do business with and how.

Construction accounting takes into consideration the challenges that come along with the construction business. This includes tracking revenue, job costing, payroll, and managing several contracts and project risks simultaneously. Because the building process is so uniquely complex, accounting practices must be adapted to the construction industry.

Let’s look at what makes construction accounting different from most other businesses.  

Everything Is Moving All the Time

The nature of construction is quite different from your average business. Outside of a major project roadblock, all aspects of a construction project are moving forward simultaneously. Instead of operating from a fixed location with a fixed set of products or services, construction projects rely on a range of locations, materials, and services. Everyone and everything tends to always be on the go. As a result, accurately managing milestones and finances throughout the life of a project—whether payables or receivables—can be challenging.

Unique Project- and Contract-Based Milestones

Firms typically work on multiple projects at a time. Instead of having one transaction, organizations may have multiple transactions occurring simultaneously across several project partners. Each project partner likely has their own set of timelines and milestones that impact accounting. Furthermore, it can take time to actually receive payment for services rendered. Some firms use project-based accounting. In this practice, each project functions as its own entity with profits and losses. 

Another consideration for construction accounting is long-term contracts. It’s not uncommon for projects to take years to finish. In these scenarios, expenses and revenue may occur at different times than had been originally planned. Knowing the implications of when and how to accrue income and expenses across multi-year projects is an art in itself. 

Tracking Sales

Businesses often create categories and cost codes to track sales. There are often multiple vendors on projects in construction, whether that’s to account for materials or services, there are often tens, if not hundreds, of billable line items on any given job. Traditional accounting practices leave a lot of room for error and confusion. Purpose-built construction accounting software can help to automate this process and meet the need for multiple service or product categories. Smarter categorization enables a much cleaner look at overall business performance. This is made especially easy with dedicated construction accounting software.

Industry-Specific Costs and Expenses

Every construction job involves direct and indirect costs that cross multiple categories. To make things even more complex, items that you might consider overhead expenses are often actually costs of goods sold because they are connected to a client project. Overhead costs can fluctuate month to month based on workers’ compensation, subcontractors, insurance, training, and more.

What to Include in Construction Job Costing

The complexity of construction accounting extends to calculating how much a project will actually cost the firm. That’s where job costing comes into play. This calculation method divides the project into specific tasks. That way, you can track expenses to the various tasks of a project. It provides greater visibility into which projects, activities, and materials are generating the most costs

With job costing, you can separate the project into the main phases and then sort scopes of work into each phase. Organizations can then create unique construction cost codes to track the expenses. You may choose to create a handful of codes or multiple codes for a more granular view. After developing the codes, you can generally divide them into five categories: labor, materials, subcontracts, equipment, and overhead. 

Labor 

How much does your crew cost you? That’s what the labor categories in job costing can help you answer. To find this number for each project, start by calculating how much it costs per day to have your crew. This is likely to be your high level hires like general contractors, who you’ll interface with regularly. Don’t forget to include insurance, worker’s compensation, and taxes into the figure. You can then multiply the number of days you’ll have the crew on the project. 

Be sure to include a buffer for unforeseen labor costs in your estimates. Project progress is rarely linear. You’ll also want to parse out subcontractor costs with the help of your general contractors. More on that below.

Materials

These costs can be both direct and indirect. For example, direct material costs can include items like concrete and steel. It’s often easier to link these items to a specific project. Indirect material costs include things like nails and caulking. You may also apply a margin for delivery and cleanup. It’s important to think of the life of a material, and any complimentary materials, when costing your project.

Subcontracts

General contractors are enlisted to manage construction activities and schedules, but are also instrumental in minimizing risks and issuing subcontracts. Each subcontract encapsulates costs for a general contractor and revenue to a subcontractor for specific scopes of work on a construction project. Managing subcontractor payment applications is fundamental to construction accounting, and also drives the upstream receivables, as subcontractor costs translate into general contractor revenue.

Equipment

Depending on whether or not your contracted labor brings equipment to the table, you may want to cost this out separately. At which point, identify your equipment supplier rates and multiply by the estimated length of the project or time needed with that particular asset. It’s possible that equipment needs will span multiple projects. 

If your contracted labor does bring equipment to the table, work with them to identify expected costs for a clear picture of how your equipment impacts accounting activities over the life of a project.

Overhead

A lot of work goes on behind the scenes so you can’t forget to include the cost of doing business. That means you’ll need to measure accounting activities that go beyond the above mentioned categories. In other words, don’t forget about overhead when job costing. Some things to consider including would be full-time staff, office rentals, administration, and depreciation of equipment.

5 Steps for Revenue Recognition in Construction

Revenue recognition is the accounting of revenue when certain conditions are met on a project. Certain governing bodies issue revenue recognition standards to disseminate accounting best practices.

The Financial Accounting Standards Board (FASB) and International Accounting Standards Board (IASB) updated reporting standards for revenue recognition from contracts with customers in 2014. This standard is known as Accounting Standards Codification Topic 606 (ASC 606), or more simply, the new standard. Prior to the new standard, many organizations relied on the percentage-of-completion method and completed-contract method.

According to FASB, the intent for the latest guidance is to “report useful information to users of financial statements about the nature, timing, and uncertainty of revenue from contracts with customers.”

FASB has adopted a principle-based revenue recognition approach. With this approach, revenue is recognized according to two key factors. First, the contractor must meet performance obligations. Second, the control of goods or services must be transferred to the customer. This transfer can take place at a particular point in time or over a period of time. 

To comply with revenue recognition standards, or ASC 606, be sure to follow these five steps:

Identify the contract with the customer.Identify the performance obligations in the contract.Determine the transaction price.Allocate the transaction price to the separate performance obligations.Recognize revenue when (or as) the entity satisfies a performance obligation.

Top Construction Accounting Technologies

Dedicated construction accounting software solutions can help to optimize processes and automate manual tasks. As you consider ways to improve your construction accounting processes, keep these leading solutions in mind. 

QuickBooks Online (Intuit)This cloud-based financial management software helps you manage your finances efficiently and gives you time back in your day. Create estimates, build invoices, track sales, monitor cash flow, and manage your customers as well as suppliers from one intuitive platform. Oftentimes, QuickBooks Online will be integrated with a project management platform to track costs and provide an operations team with the tools they need to control documents and manage budgets.

Morpheus Connect any ERP to Autodesk Build’s leading budget and cost management solution for a truly integrated financial environment. No more double entry, manual errors or missed information.  You gain full transparency from the field to the office on job costs.  Trusted for over 20 years by the ENR 400.

DataStreet: DataStreet was built to eliminate time and material tag paperwork and reduce the amount of time spent on change order processing. The cloud-based project management platform increases transparency between your office and field teams. All of the data is stored in the cloud for easy access; use project-specific settings to customize your workflows and experience. 

Rhumbix: Want to streamline your field operations? Rhumbix can do just that by quickly capturing timekeeping data, time and materials changes, and factors impacting construction labor costs. Get all the insights you need to make smart decisions about labor cost management, risk management, and safety while easily connecting to your existing accounting solutions.

SageAutodesk Construction Cloud partners have built dynamic integrations between Sage 300 Construction and Real Estate and Autodesk Build, uniting accounting, project management, and field collaboration. Manage cost-related activities, streamline workflows, and connect data for greater real-time visibility into your project’s financial health.

Wrapping Up

As you can see, there’s a lot of nuances specific to construction accounting. The software solutions that exist are getting better at addressing these complexities every single day. 

With the right construction accounting software, accurately job costing, tracking timelines, and adhering to the revenue recognition standards is much easier. It puts owners and contractors on the same page throughout the life of a project. Plus, the standardized approach makes tracking company-wide finances across all projects a much less daunting task.

The post A Practical Guide to Construction Accounting Software appeared first on Digital Builder.

Construction Management

Scaling for Success in the Plant and Manufacturing Industry Through Standardised Ways of Working

Axalta Coating Systems Ltd are a leading global coatings provider dedicated to the development, manufacturing, delivery, and service of liquid and powder coatings, with their headquarters in Philadelphia, USA. With over 150 years of experience in the coatings industry, they provide their customers with innovative, colourful and sustainable solutions.

Predominantly developing and manufacturing coatings for light and commercial vehicles, industrial and refinish applications; Axalta embraces the latest trends alongside emerging technology and systems to deliver the finest coatings to more than 100,000 customers across the globe. With 46 manufacturing centres across the world, 28 laboratories and a presence in over 130 countries, the team at Axalta are constantly looking at news ways to push boundaries.

Marco Schuh, BIM Manager at Axalta, has worked in the architecture, engineering and construction industry for the last 20 years. In his various roles, Marco has witnessed the vast expansion of computer-aided design first-hand and has seen Business Information Modelling (BIM) use and demand rapidly increase. “For the last five years, I have been focusing on cloud-based project management practices in a BIM environment, so I have seen the application and the technology grow too,” says Marco.

In 2019, Axalta’s plant engineering subsidiary business based in Wuppertal, Germany began exploring how they could move some of their local project data from a local server into the cloud. The team wanted to be able to host and store project documentation centrally in a secure environment but also to learn more about how they could improve, implement, and embed digital workflows for this business unit to aid communication and collaboration.

Standardising ways of working

With many different document management practices happening on the ground for the plant engineering team, ensuring standardised document management processes were implemented smoothly was very important. Alongside this, the team also needed to find a solution that allowed everyone to access the documents they needed wherever, and whenever they needed them.

Working in a plant environment with tight timescales means that the team at Axalta cannot afford to lose project time due to poor communication because of missing project data. The team were already using a server solution for internal documentation, but it limited their ability to successfully access, track and collaborate on documents in a transparent way.  

After a period of exploration, Axalta concluded that Autodesk Construction Cloud’s BIM 360 solution was the right technology for Axalta’s needs with a focus on improving communication. To implement the solution successfully and smoothly, Marco partnered with Autodesk’s customer success team and their local reseller partner, Mensch und Maschine Deutschland. It was crucial that the team at Axalta were able to move their interdisciplinary project data into the cloud environment in a seamless way, minimising any disruption to ongoing live projects.

“Our projects are time-critical, so we need smooth, transparent, clear communication and filing to know where project data was stored as we transitioned from our previous system to BIM 360,” Marco reflects.

Creating a comprehensive transition plan

Scaling for success in the plant and manufacturing industry through standardised ways of working

The team at Axalta were aware of the long-term negative impacts that could arise from disruption to ongoing projects, so they created a comprehensive transition plan. The plan, which spanned a 12-month period, involved an elaborated transition process which included a testing and a migration phase. This happened in parallel with Axalta’s ongoing day-to-day regular processes, so the team were managing two ways of working at once. Working in this way helped to minimise any interruptions or delays to ongoing work and allowed the team plenty of time to understand and prepare employees for new ways of working within the team.

To get started, the team at Axalta began their journey with BIM 360 on a large collaborative project which involved several stakeholders – many of which were not directly located on site at Axalta’s plant facility. To ensure all the external collaborators and partners were safely and comprehensively introduced to the solution and the new ways of working, Marco conducted introductory sessions on site. As well as this, Marco and the team created an internal handbook for project team members to use with a complete overview of the BIM 360 project workflows that would be rolled out.

We worked closely with the team at Autodesk to ensure we transitioned successfully, and this included bi-monthly calls with tech champions, mentorship on workflows for these champions, feedback sessions with Autodesk’s product team as well as ongoing communication on outcome-focused goals,” says Marco.

Internal plant maintenance projects and construction projects for new plants began using BIM 360 for document management and digital workflows. The team began with a focus on document management practices but soon expanded into using other capabilities BIM 360 had to offer. Naming conventions and folder structures were the first areas the team focused on as well as supporting the Computer Aided Design (CAD) teams with how they could digitalise and integrate their processes with BIM 360. This involved training sessions and one-to-one support by Marco as a BIM 360 expert.

We began exploring the functionality that allowed our teams to make notes and annotations onto our models in BIM 360 which increased accountability, transparency and communication immensely,” says Marco. “Annotating directly on the model meant that we minimised the chance of anything being missed when moving between different platforms and systems.” The team have also looked at what other digital workflows they could expand to use such as issues tracking.  

For the team at Axalta, using BIM 360 as their common data environment meant internal communication on projects improved significantly. Marco says: “BIM 360 gives us a single source of truth, transparency between all project stakeholders, and accessibility from anywhere meaning we’re all much better informed during a live project than we were before we started using BIM 360.” For the team, quality has increased dramatically as all project team members can be sure they are accessing one single source of truth. As well as this, standardising the team’s approach to document control and modelling has meant that all project collaborators can be sure they have the most up-to-date and accurate information they need when making important project decisions related to their tasks and activities.

Scaling for success

After a year of testing and using BIM 360 in the plant engineering subsidiary business, the use of BIM 360 is being explored by some of Axalta’s manufacturing, construction, and engineering departments in their locations in Germany.

Looking to the future, we plan on expanding our use of BIM 360 in plant and engineering even more,” affirms Marco. “We’ve also began integrating further technology into BIM 360 such as our laser scanning workflows and we’re looking to use the BIM 360 Coordinate feature to improve our model coordination processes,” remarks Marco.

For the team at Axalta, implementing BIM 360 to create robust document management processes, digitalising workflows and capturing project progress information in a BIM environment has not only improved team collaboration but delivered better project outcomes. “The most popular features in BIM 360 that our teams are using are the, project management, model coordination and issues management workflows as well as the powerful approval workflows for reviews within document management capabilities which reflects how the quality of our projects are improving through the use of BIM 360,” says Marco. Looking to the future, implementing the use of BIM 360 on more and more projects is the focus for the team as well as harnessing data for better project insights to drive decision-making across the business.

The post Scaling for Success in the Plant and Manufacturing Industry Through Standardised Ways of Working appeared first on Digital Builder.